Slipforming of Preheater for Airvault Cement Plant
Our heavy duty slipform in top position, 97.7 meters above the ground. The construction is part of the CO2-reducing upgrade for Ciments Calcias (Heidelberg Materials) Airvault cement plant, France.
The building has a challenging geometry supported by four corner columns, with reducing thickness - connected by concrete beams in 7 levels. The span of the beams is between 14 and 19 metres. The entire geometry has been cast using our heavy duty slipform system in a continuous process, interrupted for short periods during the installation of supports for the casting of the beams.
The project is carried out together with Thyssenkrupp Industrial Solutions AG and Vinci Construction. Completed Apri...
Просмотров: 257

Видео

Slipforming the CN TowerSlipforming the CN Tower
Slipforming the CN Tower
Просмотров 27611 месяцев назад
February 22, 2024 marks the 50th anniversary of the final lift of the slipform jacks to complete the CN-Tower's main shaft. The slipform rig was then 446 meters above the ground where the process was initiated, June 26, 1973. Together with the slipform rig, a tower crane was lifted on the journey up to the top using at most 54 nos slipform jacks type R72. When the observation deck "the SkyPod" ...
Caisson Production at Tuas Megaport [CLIP]Caisson Production at Tuas Megaport [CLIP]
Caisson Production at Tuas Megaport [CLIP]
Просмотров 14 тыс.3 года назад
A clip from CNA-Insider's documentary series "Tomorrow City" about Singapore's ongoing land development. Here is how the caissons are slipformed and transferred out to sea to become part of the giant Tuas Mega port - the world's largest container port when it is completed in 2040. We contribute to the project with our slipform technology, as well as our skidding system to transfer the caissons ...
Steel Tank Construction: Bygging-Uddemann's Jacking System for Steel TanksSteel Tank Construction: Bygging-Uddemann's Jacking System for Steel Tanks
Steel Tank Construction: Bygging-Uddemann's Jacking System for Steel Tanks
Просмотров 40 тыс.3 года назад
Our system for steel tank construction is as safe as it is simple. This video presents the basic principles of the system. Our first construction systems for steel tanks and hydraulic jacks were introduced as early as the 1950s. With these, we were pioneers in the field. Since then, we have continued to develop our systems. Read more about our jacking system for steel tanks here: www.bygging-ud...
Slipform rig lift off!Slipform rig lift off!
Slipform rig lift off!
Просмотров 7846 лет назад
Project Donghae Beakwater Sect. 1 During the weekend, we made the first lift for project "Donghae Breakwater Section 1" in South Korea. Within one year, 30 caissons will be produced and transfer by our slipform and transfer system. Project: Donghae Breakwater Section 1 Client: Daelim Industrial Co., Ltd.
Slipforming with Gantry: Fabrication and transfer of caissonsSlipforming with Gantry: Fabrication and transfer of caissons
Slipforming with Gantry: Fabrication and transfer of caissons
Просмотров 3,7 тыс.6 лет назад
Our double gantry slipform & skidding system in action in Tuas, Singapore. Client: Hyundai Eng. & Constr. Co., Ltd. Construction year: 2015-2017 Caisson size: 18 m x 39.9 m x 29.4 m Caisson weight: approx 14 000 tons Totally 91 Caissons
Slipforming Pylons, incredible slipform performance, 3rd Bosphorus BridgeSlipforming Pylons, incredible slipform performance, 3rd Bosphorus Bridge
Slipforming Pylons, incredible slipform performance, 3rd Bosphorus Bridge
Просмотров 4,3 тыс.7 лет назад
On August 26, 2016 the third bridge over the Bosphorus (Yavuz Sultan Selim Bridge) was opened. The bridge is located near the Black Sea entrence and creates a link across the Bosphorus Strait, which divides Asia and Europe. The bridge pylons, triangular in cross section and with 1.50m wall thickness, were constructed using our design and slipform technique. Today, at 322 m, 3rd Bosphorus bridge...
Slipform Construction combined with Skidding technique: Tuas Finger 2, Project HighlightsSlipform Construction combined with Skidding technique: Tuas Finger 2, Project Highlights
Slipform Construction combined with Skidding technique: Tuas Finger 2, Project Highlights
Просмотров 17 тыс.8 лет назад
For more information about the project, go to: www.bygging-uddemann.se
Slipform & Skidding systems combined : Bygging-Uddemann's method for Caisson ProductionSlipform & Skidding systems combined : Bygging-Uddemann's method for Caisson Production
Slipform & Skidding systems combined : Bygging-Uddemann's method for Caisson Production
Просмотров 6 тыс.9 лет назад
During our projects for advanced caisson production we use our skidding system for moving the caisson between three construction stations. Step 1. Transfer the prefabricated caisson slabs safely from slab station into slipform gantry with high accuracy into position for docking with slipform shutter. Step 2. Transfer a complete caisson from gantry station safely onto a floating dock. Contact us...