Kapitol Group
Kapitol Group
  • Видео 135
  • Просмотров 137 698
Project Coordinator Retreat 2024| Building Tomorrow's Leaders
Our recent Project Coordinator Retreat brought together a diverse group of coordinators from across projects, providing them with a platform to voice challenges, share solutions, and build connections-key steps in developing the future leaders of our industry. With guidance from our directors and senior leaders, these discussions created a space for open, honest dialogue, allowing coordinators to raise pressing issues, share ideas, and collaborate on solutions.
As our directors noted, “This room is filled with the future leaders of our business-and the industry. If we nurture this talent and truly listen, there’s a significant opportunity ahead."
Watch the video to hear from the PC's as the...
Просмотров: 8

Видео

St Columba's College | Discovering the Construction Industry with Kapitol Group
Просмотров 117 часов назад
We recently welcomed Year 10 students from St Columba's College to one of our data centre projects for a week-long, project-based learning experience. The students explored our site, asked questions, and gained fresh perspectives on the built environment. An engaging panel discussion with our team highlighted the variety of career paths within the industry, inspiring many who hadn't previously ...
Virtual Reality | Construction in Action
Просмотров 5814 часов назад
Our digital engineering team recently took project visualisation to a new level by trialling a virtual reality walkthrough for our client to experience through VR. Using Twin-motion and integrating 3D models from our consultants and trade partners, we crafted an immersive experience that allowed our client to envision the entire project-not only before stepping on site but even before construct...
Precast Panels Factory Visit | High Street Preston BTR
Просмотров 9514 дней назад
Kapitol Graduate Alex Glavic has been given the responsibility of QA for our precast basement panels on our High Street Preston build-to-rent project. Regular factory visits to Auscast forms an important part of the QA process so we can inspect the progress of the precast panels in collaboration with our client partner, Barings. The visits also provide Kapitol and Barings the opportunity to ens...
Official Opening | NEXTDC D1 Darwin Data Centre
Просмотров 4221 день назад
Our first interstate project is officially open - the NEXTDC D1 Darwin Centre! Yesterday marked the grand opening of this state-of-the-art data centre, developed in close partnership with the Northern Territory Government, Vocus, and module build partner Vertiv. The D1 facility is set to revolutionise digital infrastructure in the region. The ceremony was attended by NT Chief Minister, Hon Eva ...
Introducing Kapitol Group's ESG Strategy
Просмотров 17Месяц назад
As part of our vision to 'do no harm', we are dedicated to minimising our impact through our ESG commitments. Our ESG strategy will evolve as we do. With a dedicated ESG team and a committed executive, we are proactively identifying and mitigating key ESG risks while seizing opportunities to ensure compliance with applicable laws, and upholding ethical business practices. Watch the video to fin...
Specialists | Commercial Team
Просмотров 49Месяц назад
Meet two of the faces that make up the commercial team here at Kapitol Group: Ben Renick and Rachel Cairnes, both Senior Contract Managers. They oversee the entire commercial landscape of a construction project from the initial handover from our estimators through to procurement of trade partners and completion. In this video Ben and Rachel discuss how the team is leveraging cutting-edge system...
Introducing Kapitol Group's ESG Strategy
Просмотров 61Месяц назад
Introducing Kapitol Group's ESG strategy, goals and targets, and what we've achieved so far. Hear from; - Director Andrew Deveson - Head of HSQ & ESG Amanda Clements - ESG Manager Tayla Fairthorne To learn more about Kapitol Group Website: www.kapitolgroup.com.au/ Instagram: kapitolgroup Linked In: www.linkedin.com/company/kapitol-groupau/
Inspiring the Next Generation | Work Experience Students
Просмотров 37Месяц назад
Improving the construction industry for a better life means creating opportunities for the next generation to see the potential in what we do. Recently, our grads and cadets have taken on the responsibility of coordinating our work experience program with high school students, aiming to dispel myths about what construction is and isn't. At Kapitol we believe that by engaging students from a you...
Specialists | Quality Team
Просмотров 55Месяц назад
Led by Quality Manager, Rob Montepaone, our quality team are committed to continuous improvement, they drive the integration of quality throughout all project phases, promoting a quality mindset that is embedded into our operations. "We want to drive the change from a reactive to a proactive mindset...The quality team drive our continuous learning and improvement process through conducting trai...
PROJECT COMPLETION | Scape Student Accommodation
Просмотров 742 месяца назад
This is our first venture into student housing, and it has been a collaborative and innovative journey. Working in close collaboration, senior project manager, Michael Buckthought, and Scape's senior construction manager, Shane O'Keefe, led the charge in creating modern student living spaces. Situated close to Melbourne University, this 14-floor development features 300 student beds with balcon...
Customer Focused | The Little Things
Просмотров 262 месяца назад
Learning from past experiences, we have come to understand the importance of not overlooking the small details. Our Customer Experience Manager, Laurence Fox, highlights how every interaction, no matter how small, can significantly impact our clients. By customising our interactions to suit the unique needs of each client and always putting them first, we're demonstrating our understanding of h...
Celebrating Our Team's Success!
Просмотров 232 месяца назад
We're genuinely proud to share a highlight reel of all our 2024 promotions to-date. These individuals have achieved significant milestones through their dedication and hard work, whether it's overcoming challenges on-site or innovating in our offices. Each promotion at Kapitol reflects our core values of authenticity, drive, and mutual support. These values are integral to our culture, inspirin...
Kapitol Group's Construction Graduate Program
Просмотров 552 месяца назад
Unlock your potential in the construction industry with: 🏗️ 2-year rotation program across all facets of the industry 🏗️ Hands-on experiences that expose you to works on site and head office. 🏗️ 5-day work week, no Saturdays! 🏗️ Attend our graduate retreat - featuring a mix of workshops and Q&As to develop your technical and interpersonal skills alongside our Executive Leadership Team, includin...
Nine News | ClearVuePV’s Solar Windows
Просмотров 1842 месяца назад
Kapitol are thrilled to be the first commercial builder in Australia to install ClearVuePV’s solar windows, set to enhance the CFMEU’s Training and Wellness Centre in Melbourne. This marks a significant milestone for ClearVue, as well as showcasing the CFMEU’s and Kapitol’s commitments to sustainable building practices and energy efficiency. The decision to specify the product was made by award...
Inclusivity and Innovation: Integrating New Voices at Kapitol
Просмотров 102 месяца назад
Inclusivity and Innovation: Integrating New Voices at Kapitol
Green Star Projects | Building a Sustainable Future
Просмотров 162 месяца назад
Green Star Projects | Building a Sustainable Future
PROJECT COMPLETION | MORRIS MOOR BUILDING 4
Просмотров 392 месяца назад
PROJECT COMPLETION | MORRIS MOOR BUILDING 4
Behind the Scenes with Kapitol's Project Coordinators
Просмотров 1442 месяца назад
Behind the Scenes with Kapitol's Project Coordinators
Generators and EFC Installation | NEXTDC M2 Data Centre
Просмотров 4383 месяца назад
Generators and EFC Installation | NEXTDC M2 Data Centre
Name The Crane Competition | Yarra Valley Grammar
Просмотров 3233 месяца назад
Name The Crane Competition | Yarra Valley Grammar
Our ECI Journey with HDR Architects
Просмотров 453 месяца назад
Our ECI Journey with HDR Architects
NGV Design Week | Morris Moor
Просмотров 413 месяца назад
NGV Design Week | Morris Moor
Topping Out | CFMEU Training & Wellness Centre
Просмотров 4333 месяца назад
Topping Out | CFMEU Training & Wellness Centre
National Reconciliation Week 2024
Просмотров 483 месяца назад
National Reconciliation Week 2024
Supplier factory visit with George Cooney!
Просмотров 3763 месяца назад
Supplier factory visit with George Cooney!
Head Contractor & Architect Collaboration with HDR
Просмотров 333 месяца назад
Head Contractor & Architect Collaboration with HDR
INNOVATION | BIM flythrough at D1 Darwin data centre
Просмотров 564 месяца назад
INNOVATION | BIM flythrough at D1 Darwin data centre
Specialists | Planning Team
Просмотров 304 месяца назад
Specialists | Planning Team
PROJECT ANNOUNCEMENT | HIGH ST PRESTON BTR
Просмотров 674 месяца назад
PROJECT ANNOUNCEMENT | HIGH ST PRESTON BTR

Комментарии

  • @MrSanad91
    @MrSanad91 3 дня назад

    Hi, good job here. Does the steel frame thermal expansion effect the rammed earth enclosing it at all? Is there any cracking observed on the face of the Rammed Earth panels due to difference in materials? Since the project is 2 years old now should be suitable sample size to determine the effects if any.

  • @Iggyplayz1611
    @Iggyplayz1611 28 дней назад

    Cool

  • @杨思思-o4m
    @杨思思-o4m Месяц назад

    Hello, I noticed that your company is very professional in the curtain wall, can I communicate and cooperate with you?

  • @NasrRicardo
    @NasrRicardo Месяц назад

    Thanks for an awesome vid. May I ask, what is the purpose of the deeper excavation and pad towards the back of the basement? Is this for an elevator shaft? Many thanks.

  • @HennessyLopio
    @HennessyLopio Месяц назад

    what retaining wall method did you use?

    • @kapitolgroup
      @kapitolgroup Месяц назад

      Hi, the basement is a non-hydrostatic piled retention system. It uses bored piers, a capping beam and shotcrete infill walls as the earth retention system.

  • @pas-pasan
    @pas-pasan 2 месяца назад

    Mantap

  • @user-xe9mq3qf7i
    @user-xe9mq3qf7i 3 месяца назад

    👊👊👊👊👊

  • @marloraske5203
    @marloraske5203 4 месяца назад

    "promosm"

  • @user-xe9mq3qf7i
    @user-xe9mq3qf7i 5 месяцев назад

    Awesome stuff

  • @budowaslask
    @budowaslask 9 месяцев назад

    Świetna robota !😊

  • @sanikads1268
    @sanikads1268 9 месяцев назад

    is it possible to get the construction details of the columns, please. drawings might as well help

  • @sepehrvakili2121
    @sepehrvakili2121 10 месяцев назад

    Great job, what are those red and grey buried tanks shown in timelapse video used for?

    • @kapitolgroup
      @kapitolgroup 10 месяцев назад

      Thank you. The red/orange tanks are sewer pump tanks. The grey tank is a rainwater tank for use on the project, such as irrigating gardens.

  • @matribhumiunnayanvlog336
    @matribhumiunnayanvlog336 10 месяцев назад

    Great job ❤

  • @matribhumiunnayanvlog336
    @matribhumiunnayanvlog336 10 месяцев назад

    Great job ❤

  • @SJR_Media_Group
    @SJR_Media_Group 10 месяцев назад

    I had to chuckle when things got wet and everything turned into mud. I worked jobs in Seattle and we never quit for rain. I invented some colorful names for the mud.

  • @costapasmore3440
    @costapasmore3440 Год назад

    😍😍💯😘! Grow your page easily - 𝐩яⓞ𝓂𝓞Ş𝐦 !

  • @ErdeLebt
    @ErdeLebt Год назад

    This not rammed earth! This is just dirty concrete!!! You need probably double the amount of cement than in a nomol concrete wall! How can that be better for the environment??

    • @kapitolgroup
      @kapitolgroup Год назад

      Hi Johannes, Precast concrete uses upwards of 20% cement, washed sand (a high-embodied energy material) and crushed rock (ditto). It requires substantial infrastructure including delivery trucks of the raw materials to the batching plant, the actual batching plant, delivery of the concrete to the precast site in massive mobile barrel mixers and often concrete pumps which need to be driven to and from the site. In contrast, the rammed earth we used, uses 7% cement and locally sourced hill granite (from a quarry 8km away from the depot). The rammed earth is built with a fraction of the infrastructure of a concrete batching plant, uses minimal fuel (25 litres per day for the bobcat and air compressor) and has no reinforcing steel unlike concrete.

    • @ErdeLebt
      @ErdeLebt Год назад

      @@kapitolgroup Thank you for the answer. It is still not rammed earth! Rammed earth contains 0% cement! This is called stabilized rammed earth period. With 7% cement you lose the best properties of clay, indoor climate regulation, moisture absorption, reusability, etc......! Please give it the right name. Rammed earth is misleading for what you are doing. Best regards

    • @bigonprivacy2708
      @bigonprivacy2708 8 месяцев назад

      This person is correct. Without clay it's not even stabilized rammed earth. However incorrect on the 7% eliminating clays moisture control and breathability. Clay does not bind to cement so it maintains moisture control but at a "slightly" lower rate.

  • @peterbeyer5755
    @peterbeyer5755 2 года назад

    What type and make of formwork did you use?

    • @kapitolgroup
      @kapitolgroup 2 года назад

      Hi Peter, we used Peri Duo Panels.

  • @Art20.30
    @Art20.30 2 года назад

    Good job 👍👍👍