Kevin Engineering
Kevin Engineering
  • Видео 19
  • Просмотров 301 421

Видео

Unit B3 chapter 2 Combustion safety part B
Просмотров 22Год назад
Unit B3 chapter 2 Combustion safety part B
Unit B3 Chapter 2A Combustion safety
Просмотров 10Год назад
Unit B3 Chapter 2A Combustion safety
A12 Chapter 2A Gaseous fuel delivery and burning equipment
Просмотров 64Год назад
A12 Chapter 2A Gaseous fuel delivery and burning equipment
A11 Chapter 2 Fire tube boiler
Просмотров 28Год назад
A11 Chapter 2 Fire tube boiler
A11 Chapter 1 Introduction to boilers
Просмотров 39Год назад
A11 Chapter 1 Introduction to boilers
A12 Chapter 3 Furnace Draft
Просмотров 2473 года назад
This video is part of a college level 4th class power engineering/operating engineering course. Key word: induced draft, forced draft, balanced draft. Draft measure, combustion gas.
A12 Chapter 2B Boiler oil burning system
Просмотров 1653 года назад
This video is part of the course of a college level 4th class power engineering/operating engineering program. It deals with Oil delivery system, oil burners, air and steam atomizing, mechanical atomizing and rotary cup atomizing.
B6 Chapter 1B Boiler water pretreatment methods and equipment
Просмотров 1213 года назад
This video is for a college level power engineering/operating engineering course. Boiler water pretreatment, sodium zeolite water softener, reverse osmosis,
B6 Chapter 1A Water Pre treatment problems with impurities in water
Просмотров 923 года назад
This video is for a college level 4th class power engineering/operating engineering course. Boiler water pre-treatment
A12 Chapter 2A Gaseous fuel delivery and burning equipment
Просмотров 563 года назад
This video is part of a 4th class power engineering/operating engineering course. It describe the basic combustion terms and the equipment required to burn gaseous fuel.
A12 Chapter 1 Combustion
Просмотров 1863 года назад
This video is for a 4th class power engineering/ operating engineering program. It describes the basics of combustion theory.
Alkalinity P & M test
Просмотров 1,2 тыс.3 года назад
This video is part of the steam lab of a college level 4th class power engineering/operating engineering program. The alkalinity test is performed on a sample from a boiler. The sample is bit dirty. It should be colourless to start with; when Phenolphthalein indicator is added, it turns pink. after titration, the pink colour disappears. When methyl purpose is added, it turns green. At the end p...
Small Water tube boiler reset buttons
Просмотров 1543 года назад
This video is part of a steam lab of a college level 4th class power engineering / operating engineering program. High gas pressure cut out, low gas pressure cut out, low water cut out, high gas pressure cut out, programmer reset, limit switch reset, water tube boiler, gas fired boiler, reset buttons
Small Water tube boiler controls
Просмотров 1813 года назад
This video is for a steam lab for a college level 4th class power engineering/operating engineering program. High steam pressure cut out, operating limit, operating control, modulating control, boiler programmer, automatic/manual
Water tube boiler gas train
Просмотров 8113 года назад
Water tube boiler gas train
Conductivity and hardness test
Просмотров 3413 года назад
Conductivity and hardness test
Sulphite test
Просмотров 4093 года назад
Sulphite test
Steam Turbine Generator Start Up
Просмотров 297 тыс.10 лет назад
Steam Turbine Generator Start Up

Комментарии

  • @ryanfitch1334
    @ryanfitch1334 3 месяца назад

    I'd be happy to major this unit with this man.

  • @balotooni2922
    @balotooni2922 4 месяца назад

    Dear kaven I want to get further details to buy … awaiting reply thanks

  • @user-dh7ms8pz6n
    @user-dh7ms8pz6n 6 месяцев назад

    You have an amazing shop sir keven ❤

  • @user-ke5ro2qj6t
    @user-ke5ro2qj6t 8 месяцев назад

    مولد كهرباء توربيني ينتج 300 كيلو وات بالساعة كم حجم الغلاية ( تعمل بالوقود الصلب - نشارة خشب) التي احتاجها وڪم حجم التوربين

  • @manuelcokehyeng9399
    @manuelcokehyeng9399 Год назад

    Hello Kevin where can i buy that steam turbine generator how many kw

  • @steamturbinesdoingjobsbyen1589

    Am operat this turbine many turbine

  • @steamturbinesdoingjobsbyen1589

    Very good

  • @johnczirjak
    @johnczirjak Год назад

    Keep making more videos. I understand the info that you give in this video and will watch the others as well. Thank You

  • @lognum4155
    @lognum4155 Год назад

    thank you ah for ah the ah presentation ah

  • @shoshohamad9324
    @shoshohamad9324 Год назад

    this is good work.thankfully

  • @shoshohamad9324
    @shoshohamad9324 Год назад

    this is good work.thankfully

  • @ATI556
    @ATI556 2 года назад

    Outstanding Video thank you for showing this.

  •  2 года назад

    You are so good

  • @eee_bangla
    @eee_bangla 2 года назад

    great

  • @piethean8924
    @piethean8924 2 года назад

    if I want 500kw How much?

  • @YamchaIsMyPapa
    @YamchaIsMyPapa 2 года назад

    Great video, thanks Kevin!

  • @user-uw1gt9rc8v
    @user-uw1gt9rc8v 2 года назад

    СУПЕР СПАСИБО БОЛЬШОЕ ВСЕМ!!!!!

  • @Tadeuszusany
    @Tadeuszusany 2 года назад

    Thank you Kev

  • @usepchannel9058
    @usepchannel9058 2 года назад

    Waww i like it...

  • @juancabrera-ru9jx
    @juancabrera-ru9jx 3 года назад

    Thank you Kevin

  • @oldperson951
    @oldperson951 3 года назад

    Install a Barber-Coleman Isocronous governer, and use a magnetic pickup to sense shaft speed, with a 4-20Ma signal to control the valve position with a Limitorque L120. This will make the system Isocronously goverened at 60 hertz.

  • @onekycarscanners6002
    @onekycarscanners6002 3 года назад

    How long does or can this turbine run for weekly.

  • @rajeshmv515
    @rajeshmv515 3 года назад

    Add more videos

  • @laithalhaydar4248
    @laithalhaydar4248 3 года назад

    Hi, thanks for the video, i like to have a steam turbine generator to my house, is there any advise or a study like the cost?

  • @ek9772
    @ek9772 3 года назад

    What is the source of the steam?

  • @papabits5721
    @papabits5721 3 года назад

    Walve!

  • @robertreynolds1044
    @robertreynolds1044 4 года назад

    Are you a Navajo? You sure sound like my Dineh friends.

  • @hubert187
    @hubert187 4 года назад

    Interesting that your load bank is just a bunch of light bulbs. Shouldnt the governor regulate the Hz on its own, or is a manual regulating valve in this case. Also where is this training facility located?

  • @scaniawahl
    @scaniawahl 4 года назад

    How many households do that single turbine supply electrisity for?

  • @robertalvarezalvaresch.4431
    @robertalvarezalvaresch.4431 4 года назад

    Esa turbinita es de planchaduria...

  • @carlhowitzer9768
    @carlhowitzer9768 4 года назад

    Thank you for explaining how the tulbine wolks!

  • @TheGreatTimSheridan
    @TheGreatTimSheridan 4 года назад

    thanks kevin. let me know if younwould like to help restore the ss united states.

  • @surajitnandy6064
    @surajitnandy6064 4 года назад

    excellent

  • @mrdirickson2203
    @mrdirickson2203 4 года назад

    His name is def not Kevin

  • @rajeshmv515
    @rajeshmv515 4 года назад

    What us the company name

  • @smogfire9179
    @smogfire9179 4 года назад

    500 and 500 is 1000.. Not 2000 watts😂

  • @andrewhoggett8148
    @andrewhoggett8148 4 года назад

    would be interesting to see what method used to create the steam

  • @ignatiusdemonseed
    @ignatiusdemonseed 4 года назад

    Were you running to a dead buss? Without automatic governor control and a synchronizing scope, I can see the potential for unit damage if you're tying into a live buss.

    • @kimmer6
      @kimmer6 3 года назад

      That's next week's video. We are going to close the breaker at 180 out of phase and see what happens.

    • @ignatiusdemonseed
      @ignatiusdemonseed 3 года назад

      @@kimmer6 Cool. Always wanted to see a generator disintegrate.

    • @kimmer6
      @kimmer6 3 года назад

      @@ignatiusdemonseed In 1989 at Blue Diamond Almond Growers in Sacramento, Calif, a 6 Megawatt generator under full load had its breaker open then slam closed thanks to faulty fault detection equipment. The generator ripped out all of its foundation bolts, output buss bars, cooling water lines, broke the shaft near the coupling, and tossed itself out and far enough over to punch a hole in the control room wall, then it fell back in the hole. My job was to supervise crews to remove a Westinghouse steam turbine and its generator from a closed plant in Danville, Virginia, and adapt it to the 20 foot high existing concrete pedestal. 3 months later it was up and running. It was shipped in pieces and was assembled and aligned in place. A machine shop near Oakland renewed many of the parts. That was a challenging job and it needed a hands on engineer/hot rodder like me to think on the fly to make it all work. The unit ran fine for years until the utility company reduced the payment for the excess power sold back to the grid. I heard that the power plant was removed and sold years ago. The boiler was fired by a mixture of wood chips and almond shells fed by conveyor belts. Extracted steam was used to dry almonds, and the entire factory ran on the electrical output of this unit. All of the extra power that was put into the grid generated money. It was one of my favorite jobs. We had an 8 foot job progress chart taped to the wall and it was completely useless 4 hours into the first day.

    • @ignatiusdemonseed
      @ignatiusdemonseed 3 года назад

      @@kimmer6 Great experience, bro! That's true cogeneration. In a scheme like that there's profit opportunity at every corner. In 1989 i was an operations shift supervisor at a five-unit coal-fired plant on the Ohio River. Saw some strange stuff but nothing overtly catastrophic like your deal at Blue Diamond. Did that until 2003 then went into generation dispatch, everything from solar to nukes. That was fun. Retired now.

    • @kimmer6
      @kimmer6 3 года назад

      @@ignatiusdemonseed I used to tell operators to leave the control room, take a few hours off ''Because a watched pot never boils''. You can tell who a Plant Operator is at a party. He's the one who's feet hit the desk before his butt hits the chair. Its cool to know that you know where electricity comes from and everything it needs to get distributed through the grid. All of my friends think it just comes out of the wall outlet. We had rolling blackouts here in Calif this Summer thanks to extreme heat. Not at my house.....I have lithium battery banks, inverters, transfer switch to rig for silent running. There's an Onan 7500 diesel gen set on a 40 gallon fuel skid with rubber mounts bolted to my garage floor in case of a quake. That's for recharging on rainy days. I retired in 2018 and life is going well...so far.

  • @user-mp7wc6iq9q
    @user-mp7wc6iq9q 4 года назад

    I need 1 of these.. haw match or haw money.. thank you

  • @rickyrexa655
    @rickyrexa655 5 лет назад

    What's BVP???

    • @zelkhantntp9435
      @zelkhantntp9435 5 лет назад

      I guess it's BPV or Back Pressure Vessel.

    • @rickyrexa655
      @rickyrexa655 5 лет назад

      @@zelkhantntp9435 for what??

    • @zelkhantntp9435
      @zelkhantntp9435 5 лет назад

      @@rickyrexa655 Steam turbine exhaust is being used to pressurize steam vessels for other operations inside a plant or mill. Usually steam turbine will receive higher pressure steam, let's say 20 bar. After being expanded inside turbine, the steam will drop pressure to around 3 bar. This steam will exit through exhaust pipe. It's wasting energy if we didn't capture the exhaust steam, so we capture it inside pressure vessel, known as BPV. BPV pressure will be used for other low pressure operation as needed by the mill or plant.

    • @rickyrexa655
      @rickyrexa655 5 лет назад

      @@zelkhantntp9435 and than.. For what savety valve...

  • @52morse
    @52morse 5 лет назад

    I love the resistive load test. The incandescent doesn’t lie. In my service truck there’s a box labeled sure-meter. There’s a rubber pigtail socket with alligator clips and a 75W INCANDESCENT bulb. My digital meters have been known to lie. Great video. Also noticed you turned your head when you threw your feeder breakers. Also good practice. Curious of the hp. How does the turbine handle current in-rushes?

  • @sudeepsingh518
    @sudeepsingh518 5 лет назад

    Nice sir

  • @ryancastillo6436
    @ryancastillo6436 5 лет назад

    I try to offer this..

  • @davidkinasevych8439
    @davidkinasevych8439 5 лет назад

    Good Job, Kevin. Compliments to Mr. Aisman on the camera.

  • @kamilcopur6513
    @kamilcopur6513 5 лет назад

    Many thanks for the educational explanations....

  • @atinturret6121
    @atinturret6121 5 лет назад

    Where can i BUY a steam turbine to generate electricity

    • @MockingBrd.
      @MockingBrd. 5 лет назад

      In order for you to do that, you'd need a boiler to produce stream for the turbine. You'd need fuel to run the boiler. So its more than just a steam turbine needed...

  • @edism
    @edism 5 лет назад

    lol your reaction when it was running @65Hz, interesting upload :)

  • @silver152
    @silver152 5 лет назад

    very nice set up

  • @user-gl2yr7fw9y
    @user-gl2yr7fw9y 5 лет назад

    Hi Kevin как она устроена внутри. По какому принципу.?

  • @Blankanik
    @Blankanik 6 лет назад

    What is the size of this turbine? How many kW?