Просмотров 9 тыс.3 года назад
Oscillator Bridge Piles
Design-Build Secant Compression Ring - Soilmec SR65
Просмотров 18 тыс.5 лет назад
A Doublestar Drilling design-build secant compression ring shoring & excavation at the North Interceptor Sanitary Trunk Project in St. Albert, AB. Using our Liebherr LB36 and Soilmec SR65 to install 200 880mm diameter piles. All the piles were interlocked to provide decreased permeability of ground water into the shaft.
Soldier Pile and Lagging Shoring System - Soilmec SR65 & SM14
Просмотров 13 тыс.5 лет назад
A Doublestar Drilling Anchored Soldier Pile and Lagging Shoring System at the Augustana Site in Edmonton, AB. Using our Soilmec SR65 to drill and install the H-Beams for the 68 Soldier Piles to depths of 23m. Our Soilmec SM14 tieback drill installed five rows of 176 anchors to lengths of 18m and the total excavation depth was 19m.
Slope Stabilization Pile Wall with Doublestar Drilling's Liebherr LB28's & HS855 Crane
Просмотров 9 тыс.6 лет назад
Project was performed in the City of Calgary, on the banks of the Bow River. Doublestar's two Liebherr LB28's and HS855 Crane installed 236 CIP Concrete Piles to depths of 32m. Each pile was reinforced to full depth with 12 tonnes of steel rebar cages. Once piles were installed, 234 Ground Anchors were drilled with Doublestar's HUTTE HRB610 to lengths of 30.5m.
Shotcrete & Rock Anchor Shoring for Slide Repair with Doublestar Drilling's TEI HEM 1000 Rock Drill
Просмотров 3,7 тыс.6 лет назад
Project was located near Spray Lakes on the main access road from Canmore, AB. This was Doublestar's first project as Prime Contractor. 77 Rock anchors were installed to lengths of 16m with Doublestar's TEI HEM 1000 drill and mounted to John Deere 350 excavator. The wall design included a 130mm base layer of shotcrete and a final application of 190mm to complete the scope of work.
Anchored Soldier Pile and Lagging Shoring System completed by Doublestar Drilling
Просмотров 26 тыс.6 лет назад
A Doublestar Drilling Anchored Soldier Pile and Lagging Shoring System at the Augustana Site in Edmonton, AB. Using our Soilmec SR65 to drill and install the H-Beams for the 68 Soldier Piles to depths of 23m. Our Soilmec SM14 tieback drill installed five rows of 176 anchors to lengths of 18m and the total excavation depth was 19m.
Vibratory installation of stone columns by Doublestar Drilling's Liebherr LB HS855 Crane
Просмотров 3,1 тыс.7 лет назад
Vibratory installation of stone columns for ground improvement on four bridge abutments in Saskatoon.
Vibratory installation of stone columns by Doublestar Drilling's Liebherr LB HS855 Crane
Просмотров 20 тыс.7 лет назад
Vibratory installation of stone columns for ground improvement on four bridge abutments in Saskatoon.
Secant Pile Shoring System installed by Doublestar Drilling's Soilmec SR65
Просмотров 1,1 тыс.7 лет назад
Doublestar Drilling at the Encore Site
Continuous Flight Auger (CFA) Soilmec SF65
Просмотров 17 тыс.7 лет назад
Description
Edgemont Secant Compression Ring - Doublestar Drilling's Liebherr LB 28
Просмотров 2,3 тыс.7 лет назад
Doublestar Drilling was contracted to design, install and excavate a pit to allow access for a tunnel boring machine (TBM), which is used in horizontal boring or trenchless construction methods. The most economical shoring design was a compression ring 10.7 meters in diameter x 24.0 meters deep and consisted of 51 - 900mm diameter cased secant piles. The project was completed on time and on bud...
Continuous Flight Auger (CFA) Piles Double Star Drilling's Soilmec SR75
Просмотров 5 тыс.7 лет назад
A short video showing installation of a CFA Pile in Calgary Alberta
Liebherr LB 24 Installing Cast in Place (CIP) Piles Utilizing Segmental Casing
Просмотров 210 тыс.7 лет назад
Liebherr LB24 using segmental casing to install piles
Liebherr LB 24 and LB 28 installing seacant pile wall using segmental casing
Просмотров 18 млн7 лет назад
Liebherr LB28 installing a soldier pile using segmental casing at Marquee on 16th
Continuous Flight Auger (CFA) Project Doublestar Drilling's Soilmec SR75
Просмотров 5 тыс.7 лет назад
Continuous Flight Auger (CFA) Project Doublestar Drilling's Soilmec SR75
Anthony Henday - Permanent DCP Soil Anchors and Shotcrete Shoring System installed by a Soilmec SM14
Просмотров 4 тыс.7 лет назад
Anthony Henday - Permanent DCP Soil Anchors and Shotcrete Shoring System installed by a Soilmec SM14
Soldier Pile and Shotcrete with Tieback Anchors Shoring System Part 3 of 3
Просмотров 1,4 тыс.7 лет назад
Soldier Pile and Shotcrete with Tieback Anchors Shoring System Part 3 of 3
Soldier Pile and Shotcrete with Tieback Anchors Shoring System Part 2 of 3 Davey Kent DK725
Просмотров 6 тыс.7 лет назад
Soldier Pile and Shotcrete with Tieback Anchors Shoring System Part 2 of 3 Davey Kent DK725
Soldier Pile and Shotcrete with Tieback Anchors Shoring System Part 1 of 3 Liebherr LB24 and LB28
Просмотров 3,2 тыс.7 лет назад
Soldier Pile and Shotcrete with Tieback Anchors Shoring System Part 1 of 3 Liebherr LB24 and LB28