Story Contracting Ltd
Story Contracting Ltd
  • Видео 148
  • Просмотров 514 678
DCL/56 River Cherwell civil engineering works
Railway upgrades to improve journeys for passengers and freight between Bicester and Leamington Spa are now complete.
The stretch of the Chiltern main line reopened after essential improvements were completed by Network Rail and Story Contracting, to the important route between London Marylebone and the West Midlands.
#engineer #civilengineering #railway #networkrail #machine #transport
Просмотров: 250

Видео

Hartlepool Station upgrade complete
Просмотров 741Месяц назад
#TeamStory are proud to have recently completed works to upgrade Hartlepool Station on behalf of Network Rail Eastern Region and Tees Valley Combined Authority. The £12m project has seen platform 3 brought back into use for the first time in over 30 years, as well as the installation of a new footbridge, lifts and stairs, making the station accessible to all. Watch the video to hear more from P...
Story Scotland 10 years in 10 projects
Просмотров 1532 месяца назад
Story Scotland 10 years in 10 projects
Join us to build bird boxes with Cadishead Scouts
Просмотров 302 месяца назад
Join us to build bird boxes with Cadishead Scouts
Midland Main Line Electrification - Three Arch demolition
Просмотров 20 тыс.3 месяца назад
A milestone has been reached for the electrification of the Midland Main Line after the final bridge was demolished by Story on the Kettering to Wigston stretch to prepare for new overhead wires.
Story Charity Campaign 23/24
Просмотров 143 месяца назад
Story Charity Campaign 23/24
New multi-million-pound footbridge and lifts installed at Dumfries station
Просмотров 2114 месяца назад
The new footbridge and lift shafts are now in place at Dumfries station following works over the weekend.
Hope Valley Railway Upgrade final works
Просмотров 3,3 тыс.5 месяцев назад
On Monday 25 March the first passenger train stopped at the new fully accessible platform, marking the completion of the new track layout at Dore junction, delivered by VolkerRailStory Joint Venture on behalf of Network Rail. In the run up to this milestone, teams worked around the clock to implement the new signalling system and finalise track installation, ensuring the Dore South Curve extens...
Shields Road bridge demolition
Просмотров 5185 месяцев назад
Network Rail and Story Scotland successfully demolished Shields Road bridge in Glasgow during a period of 24-hour working over the Easter weekend. Working around the clock, excavators demolished the bridge deck from road level and, with the debris cleared from the track, work began immediately to prepare for construction of the new abutments to support the piling slabs.
PWI Practical Trackwork Challenge 2024
Просмотров 1665 месяцев назад
Story Contracting’s specialist in-house track team were proud to support the two-day Permanent Way Institution (PWI) Practical Trackwork Challenge event hosted at Bo’ness & Kinneil Heritage Railway.
Hope Valley Railway Upgrade: Dore & Totley footbridge
Просмотров 1,2 тыс.7 месяцев назад
Hope Valley Railway Upgrade: Dore & Totley footbridge
Hope Valley Railway Upgrade: Grindleford track installation
Просмотров 2937 месяцев назад
Hope Valley Railway Upgrade: Grindleford track installation
Port Glasgow Access for All Opening Event
Просмотров 889 месяцев назад
Story joined Scotland’s Railway and friends from the community to celebrate the official opening of Port Glasgow station’s £5m footbridge and lifts. The new footbridge allows passengers a safe route over the railway, with lifts providing step-free access to and from the platforms. The lift on platform 2 elevates to a second floor, bringing passengers to and from the Highholm Avenue park and rid...
Hope Valley Railway Upgrade: MAS25 bridge installation
Просмотров 1,9 тыс.9 месяцев назад
Hope Valley Railway Upgrade: MAS25 bridge installation
Uddingston AfA Visualisation
Просмотров 1179 месяцев назад
From November 2023, a project to improve accessibility at Uddingston station will commence. This project will provide step-free access to platforms 1 and 2 at Uddingston station by installing a new footbridge and lift system as part of an ongoing investment to improve accessibility in Scotland’s railway stations. Read more here: scotlandsrailway.com/projects/uddingston-access-for-all
LSC24 River Avon, Warwickshire
Просмотров 513Год назад
LSC24 River Avon, Warwickshire
Over 2000 volunteering hours delivered on the Hope Valley Railway Upgrade
Просмотров 79Год назад
Over 2000 volunteering hours delivered on the Hope Valley Railway Upgrade
Winchburgh beam lift
Просмотров 185Год назад
Winchburgh beam lift
Hope Valley Railway Upgrade: Bamford soil nailing
Просмотров 627Год назад
Hope Valley Railway Upgrade: Bamford soil nailing
Story Summer School
Просмотров 202Год назад
Story Summer School
You're in Safe Hands Campaign
Просмотров 223Год назад
You're in Safe Hands Campaign
LEC1/9E Regent’s Canal replacement
Просмотров 254Год назад
LEC1/9E Regent’s Canal replacement
Sutton Coldfield Bridge Replacement
Просмотров 628Год назад
Sutton Coldfield Bridge Replacement
Invercoe Bridge Replacement
Просмотров 908Год назад
Invercoe Bridge Replacement
Ravenscraig WCML 5,000T structure move
Просмотров 1,6 тыс.Год назад
Ravenscraig WCML 5,000T structure move
Rail Conference Scotland
Просмотров 905Год назад
Rail Conference Scotland
Saltmarket reaches halfway point
Просмотров 179Год назад
Saltmarket reaches halfway point
Hope Valley Railway Upgrade: First track installed at Bamford
Просмотров 2,3 тыс.Год назад
Hope Valley Railway Upgrade: First track installed at Bamford
Highland Spring Rail Freight Yard
Просмотров 1,4 тыс.2 года назад
Highland Spring Rail Freight Yard
Story 35 Year Anniversary
Просмотров 5942 года назад
Story 35 Year Anniversary

Комментарии

  • @michaellaudahn
    @michaellaudahn Месяц назад

    And again the same clumsy, ugly and obtrusive mast system as on the GWML. It wouldn't have to be like that. You could ask yourselves why 'they' don't learn?

  • @MattDavis_BeechingsGhosts
    @MattDavis_BeechingsGhosts Месяц назад

    Have you got any time lapse of bridge replacements?

  • @Olleetheowl
    @Olleetheowl Месяц назад

    So where is it? Is that a secret?… knowledge is power… don’t tell anyone…

  • @tomservo5007
    @tomservo5007 Месяц назад

    the Romans built that bridge

    • @qasimmir7117
      @qasimmir7117 26 дней назад

      And the railway underneath too?

  • @alistairkewish651
    @alistairkewish651 Месяц назад

    Are the Coal Lines going to be wired up as well?

  • @alistairkewish651
    @alistairkewish651 Месяц назад

    I agree with you as to the shape and design but the MR did not envisage electrification arriving for many decades. Now it has, if only in rather piecemeal stages, I gather.

  • @iangregoryhome
    @iangregoryhome Месяц назад

    😢

  • @True_NOON
    @True_NOON Месяц назад

    After a bit of searching it seem to be the bridge at roughly 52.463927,-0.887338 , and it really wasnt a loss in terms of conectivity since just 1 field further there is an underpass aswell as several other crossings , still very intersting to see such a bridge removal project sped up :)

  • @Cartoonman154
    @Cartoonman154 Месяц назад

    To be replaced with a concrete toilet.

  • @johnm2012
    @johnm2012 Месяц назад

    I thought they'd abandoned the Midland Mainline electrification project north of Kettering, once the branch to Corby had been completed. Is it continuing to Leicester, Nottingham, Derby and Sheffield or is this old footage?

    • @JoeyLovesTrains
      @JoeyLovesTrains Месяц назад

      Description says Kettering to Wigston

    • @rockerjim8045
      @rockerjim8045 Месяц назад

      it’s definitely going to be the full Midland Mainline. Sheffield and Notts to St Pancreas. About a month ago contractors were doing a night time survey in the Beeston area.

    • @beardedmonkey1320
      @beardedmonkey1320 Месяц назад

      @@rockerjim8045 it'll be interesting to see what they do on the apporoach to leicester station as that'll pose a legistical nightmare

    • @alexpeak16
      @alexpeak16 Месяц назад

      @@beardedmonkey1320I wonder if they’ll electrify the rest of the MML to Nottingham/Sheffield then try to make Leicester work. Is a low bridge the problem?

    • @beardedmonkey1320
      @beardedmonkey1320 Месяц назад

      @@alexpeak16 its not just a low bridge its also the concorse, bridge to platforms and main road, the only possible method is lowering the tracks but that would mean either lowering the platforms or moving the platforms to compensate for the tracks being lowered, im not an engineer but there isnt much spacebetween the roof of the trains and the bridge.

  • @barrysmall8645
    @barrysmall8645 2 месяца назад

    Absolute vandalism ...the track could have been lowered....don't raise the bridge lower the river..as they used to say to point out the obvious.

    • @SWRural-fk2ub
      @SWRural-fk2ub Месяц назад

      Apparently the bridge was no longer in use. (see comments above). There are plenty of other examples of this type of bridge.

    • @beardedmonkey1320
      @beardedmonkey1320 Месяц назад

      at a significantly higher cost, and who do you think would have to pay for that, bridge removal tens of thousands, lowering the tracks hundreds of thousands if not millions!

  • @ianj843
    @ianj843 2 месяца назад

    What went over the bridge and how does it cross the railway now? Very interesting though.

    • @Paul_707
      @Paul_707 Месяц назад

      An unsurfaced farm track, which was not marked as a public footpath on OS maps. It gave access to a field on the north side of the railway which is now a massive National Grid substation, and it had a new road access built.

    • @johnm2012
      @johnm2012 Месяц назад

      ​@@Paul_707Can you say where it is, Paul? If this is recent footage are they continuing to electrify towards Leicester?

    • @ianj843
      @ianj843 Месяц назад

      @@Paul_707 Thanks.

    • @lexifillems
      @lexifillems Месяц назад

      @@johnm2012Kettering - Wigston is the current section which is going to be energized on July 28th according to Network Rail.

  • @ElliottHurst
    @ElliottHurst 2 месяца назад

    F

  • @jamesbeckwith3639
    @jamesbeckwith3639 2 месяца назад

    What a lovely bridge... shame it had to go ... bet it must have been at least 2x as old as of the demo team

  • @peterrobinson903
    @peterrobinson903 2 месяца назад

    Where was the bridge located.

  • @johndean4998
    @johndean4998 2 месяца назад

    Is a replacement planned, or did the bridge carry a highway for which an alternative route is available?

    • @rockerjim8045
      @rockerjim8045 Месяц назад

      usually if a route is removed they have to reinstate it within a certain time frame

  • @MervynPartin
    @MervynPartin 2 месяца назад

    Very impressive. Nice work by the team.

  • @mauricehopper7802
    @mauricehopper7802 2 месяца назад

    Clearly this nice looking bridge was not worth applying the Bill Harvey ‘lifting’ technique of cutting the piers, raising the arches and inserting extra brickwork to provide enough clearance for the overhead wires.

  • @anthonylulham3473
    @anthonylulham3473 2 месяца назад

    Bit Sad to lose a nice bridge, would have taken a lot longer to put up than it was to take down.

    • @Roy-gi5ul
      @Roy-gi5ul 2 месяца назад

      Typical Midland Main line overbridge. Elegant and sturdy. But electrification will improve services on this important route!

    • @qasimmir7117
      @qasimmir7117 26 дней назад

      Usually most things are easier and quicker to destroy than build.

  • @johncamp2567
    @johncamp2567 2 месяца назад

    Interesting video….👍

  • @neiltonks4627
    @neiltonks4627 5 месяцев назад

    The sad thing is that all this work was done to partly allow additional passenger services to run between Manchester and Sheffield but there are no plans to introduce any! Capacity constraints at Stockport and Sheffield make that impossible at the moment. It will, of course, make services more reliable and reduce the delays caused by passenger trains being stuck behind slower freights but it’s a shame the full benefits will not be realised.

    • @highpath4776
      @highpath4776 4 месяца назад

      IF the Sheffield-Stocksbridge gets passenger service that could take a couple of TpH? Manchester can be reached via Stockport(Hazel Grove) Or the Reddish North or Hyde Routes. (Sending more from Stockport out Reddish South wont be useful as they have to cross the southbounds out of Picc, so not helpful there ? - the world doesnt have to end at Man Picc really.

  • @chorlton4
    @chorlton4 5 месяцев назад

    Although at the junction the line to Sheffield is doubled , the chord to the south has been left single still, why?

  • @janetlewis7145
    @janetlewis7145 5 месяцев назад

    Where is Hope Valley? Bill from California

    • @officialmcdeath
      @officialmcdeath 5 месяцев назад

      Broadly between Greater Manchester and Sheffield \m/

    • @SWRural-fk2ub
      @SWRural-fk2ub 5 месяцев назад

      Look up 'Dore Sheffield' on Google Earth /Maps. If you do 'Hope Valley' it will take you to the centre of the valley. Dore is where the junction is.

    • @janetlewis7145
      @janetlewis7145 5 месяцев назад

      @@officialmcdeath Thank you.

    • @keithmason7481
      @keithmason7481 4 месяца назад

      South cord single ,l assume, because of the low number of trains which use it.

  • @tomsmith48
    @tomsmith48 7 месяцев назад

    Why am I hearing Coldplay in this 😅. Not complaining, and good work too.

  • @kennethmcintyre2847
    @kennethmcintyre2847 7 месяцев назад

    Great to hear about rail improvements, but too short.

  • @Lanaranaful
    @Lanaranaful 8 месяцев назад

    ok, this is epic

  • @edgarleonard5952
    @edgarleonard5952 Год назад

    😜 Promo SM

  • @hilltaylor18
    @hilltaylor18 Год назад

    Can anybody provide background on what's happening here? Some sort if erosion control?

    • @robertdu-roe4434
      @robertdu-roe4434 Год назад

      Widening the cut to add a loop line for freight trains

  • @kennethmcintyre2847
    @kennethmcintyre2847 Год назад

    Keep the videos coming

  • @declanjoyce8640
    @declanjoyce8640 Год назад

    Excellent job....awesome..

  • @preshycodass1032
    @preshycodass1032 2 года назад

    I was cures from herpes with the help of #doctorapala who I came across on RUclips..

  • @preshycodass1032
    @preshycodass1032 2 года назад

    I was cures from herpes with the help of #doctorapala who I came across on RUclips.

  • @preshycodass1032
    @preshycodass1032 2 года назад

    I was cures from herpes with the help of #doctorapala who I came across on RUclips.

  • @preshycodass1032
    @preshycodass1032 2 года назад

    I was cures from herpes with the help of #doctorapala who I came across on RUclips.

  • @preshycodass1032
    @preshycodass1032 2 года назад

    I was cures from herpes with the help of #doctorapala who I came across on RUclips

  • @preshycodass1032
    @preshycodass1032 2 года назад

    I was cures from herpes with the help of #doctorapala who I came across on RUclips..

  • @preshycodass1032
    @preshycodass1032 2 года назад

    I was cures from herpes with the help of #doctorapala who I came across on RUclips.

  • @preshycodass1032
    @preshycodass1032 2 года назад

    I was cures from herpes with the help of #doctorapala who I came across on RUclips.

  • @michaelschofield1537
    @michaelschofield1537 2 года назад

    Your use of mobile towers is unsafe.. get trained !

  • @svaytep1272
    @svaytep1272 3 года назад

    suostei tae anak so k sabbay te

  • @brankoljubec1953
    @brankoljubec1953 3 года назад

    ⁰]

  • @terrytytula
    @terrytytula 3 года назад

    Great job, but I can't help thinking how little more it would have cost to have them add a pedestrian lane to the bridge.

    • @xaiano794
      @xaiano794 Год назад

      The pedestrian bridge is on the right, just out of sight

  • @brandonwagner4719
    @brandonwagner4719 3 года назад

    COOL

  • @1iculungman
    @1iculungman 4 года назад

    We have a "Story" company here in Tulsa, OK. wonder if they are related. hmmm

  • @MasterCivilEngineering
    @MasterCivilEngineering 4 года назад

    Watch video solutions of engineering questions to expertise your knowledge!

  • @elielevy689
    @elielevy689 4 года назад

    Thank's for your contribution. www.solytek.com/en/rail-handling-furniture/

  • @udorechner6846
    @udorechner6846 4 года назад

    So now 5 Years old it is still an amazing video. But i'm wondering too that they don't replace the old piers.

  • @Saki630
    @Saki630 4 года назад

    next time bring a bridge large enough to lift the bridge out of position and ferry it away :0 ahhaha

  • @pl2464
    @pl2464 4 года назад

    If the bridge is 140 yrs. old, then so to are the piers. They must be sound, yet no mention of them.

    • @xaiano794
      @xaiano794 Год назад

      No, the piers are significantly older. The bridge they are removing is not the original span. The piers are stone and didn't need replacing