- Видео 661
- Просмотров 22 235 848
Kashmir Explorer
Пакистан
Добавлен 17 мар 2023
Welcome to Kashmir Explorer Channel, where we unravel the power and potential of hydropower dams! Explore the global landscape of sustainable energy as we showcase iconic dams, break down complex concepts, and highlight the environmental benefits of hydropower. Stay informed with the latest industry news, connect with like-minded enthusiasts, and embark on a hydro-powered journey with us. Subscribe now and join our community in empowering the world, one dam at a time.
tournow.site
tournow.site
Power Lifting in Dam
In dam operations, **stoplogs** are heavy barriers used to control water flow for maintenance or emergencies. **Gantry cranes**, designed for lifting massive loads, play a vital role in handling these structures.
The process involves:
1. **Preparation**: The crane and stoplogs are inspected for safety and readiness.
2. **Attachment**: A specialized lifting beam securely grips the stoplog.
3. **Lifting & Placement**: The crane precisely lifts the stoplog and positions it in the designated slot to block water flow.
This method ensures safe, efficient, and controlled water management in dam systems.
#DamOperations #StoplogLifting #GantryCrane #WaterManagement #DamSafety #HydraulicStructures #E...
The process involves:
1. **Preparation**: The crane and stoplogs are inspected for safety and readiness.
2. **Attachment**: A specialized lifting beam securely grips the stoplog.
3. **Lifting & Placement**: The crane precisely lifts the stoplog and positions it in the designated slot to block water flow.
This method ensures safe, efficient, and controlled water management in dam systems.
#DamOperations #StoplogLifting #GantryCrane #WaterManagement #DamSafety #HydraulicStructures #E...
Просмотров: 971
Видео
Lifting Stoplog after a lot of Efforts
Просмотров 396День назад
After extensive efforts and meticulous planning, the team successfully lifted the stoplog from the dam spillway-a significant milestone in the operation. The task required precision, coordination, and resilience as the team faced challenges such as heavy equipment handling, fluctuating water pressure, and unpredictable environmental conditions. The stoplog, a vital component for regulating wate...
Opening Dam Intake Gate | Sediment Flushing
Просмотров 56 тыс.14 дней назад
Discover the fascinating process of dam intake gate opening and sediment flushing at a hydropower reservoir. Watch how engineers manage sediment buildup to ensure smooth operation, maintain dam safety, and enhance reservoir efficiency. Learn about the crucial role of sediment flushing in protecting hydropower infrastructure and optimizing water flow Perfect for civil engineers, dam enthusiasts,...
Spillway Flow and Stop Log Engineering Unveiled
Просмотров 850Месяц назад
Spillway Flow and Stop Log Engineering Unveiled
Innovations in Spillway Design for Modern Dam
Просмотров 987Месяц назад
Innovations in Spillway Design for Modern Dam
After Years of Sediment Build Up Flushing Operations in Hydropower Reservoir
Просмотров 37 тыс.Месяц назад
After Years of Sediment Build Up Flushing Operations in Hydropower Reservoir
Lifting a Massive 60-Ton Stoplog Safely
Просмотров 418Месяц назад
Lifting a Massive 60-Ton Stoplog Safely
Opening Overflow Dam Gate | Flap Gate
Просмотров 2,5 тыс.Месяц назад
Opening Overflow Dam Gate | Flap Gate
Lowering a Massive Stoplog into the Spillway
Просмотров 320Месяц назад
Lowering a Massive Stoplog into the Spillway
Spillway Gates Operation During High Flow
Просмотров 2,1 тыс.Месяц назад
Spillway Gates Operation During High Flow
DEBRIS AND SEDIMENTS MANAGEMENT IN DAM
Просмотров 39 тыс.Месяц назад
DEBRIS AND SEDIMENTS MANAGEMENT IN DAM
Stoplog installation in spillway of a Dam
Просмотров 181Месяц назад
Stoplog installation in spillway of a Dam
Sediment Flushing in Dam Desander and Reservoir
Просмотров 2,8 тыс.2 месяца назад
Sediment Flushing in Dam Desander and Reservoir
Efficient Dewatering of Radial Gate Chamber
Просмотров 4162 месяца назад
Efficient Dewatering of Radial Gate Chamber
Efforts to Cleanup Floating Debris From Reservoir
Просмотров 1,8 тыс.2 месяца назад
Efforts to Cleanup Floating Debris From Reservoir
Excessive Leakage in Tunnels Below River
Просмотров 5682 месяца назад
Excessive Leakage in Tunnels Below River
Opening Dam Flap Gate | Spillway Operations
Просмотров 3,1 тыс.2 месяца назад
Opening Dam Flap Gate | Spillway Operations
Top Spillway Gate Lifting Techniques
Просмотров 1,2 тыс.2 месяца назад
Top Spillway Gate Lifting Techniques
How Flap Gates Tackle Floating Debris in Reservoir
Просмотров 6 тыс.2 месяца назад
How Flap Gates Tackle Floating Debris in Reservoir
Installing a 50-Ton Stoplog at the Dam Spillway
Просмотров 1,2 тыс.2 месяца назад
Installing a 50-Ton Stoplog at the Dam Spillway
Emergency Dam Spillway Opening | Watch Amazing Closing at End
Просмотров 1,8 тыс.2 месяца назад
Emergency Dam Spillway Opening | Watch Amazing Closing at End
Incredible 50Ton Stop Log Lifting to dam deck
Просмотров 9142 месяца назад
Incredible 50Ton Stop Log Lifting to dam deck
Reservoir Sediment Flush by Spillway #waterdam
Просмотров 1,5 тыс.2 месяца назад
Reservoir Sediment Flush by Spillway #waterdam
Opening the Spillway Gates of a Dam
Просмотров 1,1 тыс.2 месяца назад
Opening the Spillway Gates of a Dam