![Boat Builder Lee](/img/default-banner.jpg)
- Видео 126
- Просмотров 106 670
Boat Builder Lee
Добавлен 29 янв 2021
This channel is about Lee's boat building projects.
rear flooring part 3
Discussion about making the starboard and port rear flooring for my Monaco.
Просмотров: 111
Видео
ceilings part 2
Просмотров 137Месяц назад
This is part 2 of progress on the ceilings including showing the ceiling planking.
ceilings part 1
Просмотров 1882 месяца назад
This describes how I plan to finish the ceilings of my boat.
Reworking exhaust tips
Просмотров 1243 месяца назад
I felt the need to rework the installation of the exhaust tips due to the way I originally installed them. This video describes why I am doing this and how I got them out.
bilge blowers
Просмотров 2714 месяца назад
Discussion about bilge blower mounting and engine compartment air volume calculations confirming the bilge blower has enough air flow capacity.
completing rear bulkhead
Просмотров 1695 месяцев назад
Details about how the rear bulkhead was completed.
rear mechanicals, deck, and bulkhead
Просмотров 2055 месяцев назад
I;m getting more done one the rear part of the Monaco including the rudder linkage and rear deck framing. I also started working on the rear bulkhead.
final rudder installation
Просмотров 996 месяцев назад
Discussion about additional rudder modifications I had to make before the final rudder installation.
installation of exhaust tips
Просмотров 1816 месяцев назад
Discussion about how the exhaust tip were installed
additional rudder information
Просмотров 2817 месяцев назад
Discussion about modifications that were made to the rudder assembly to decrease the risk of the rudder falling out.
rear flooring part 2
Просмотров 2357 месяцев назад
Additional discussion about building the rear flooring.
winterize Monaco boat engine
Просмотров 1307 месяцев назад
Discussion about the various steps to winterize the boat engine in my Monaco.
Monaco build 2000 hour check
Просмотров 2508 месяцев назад
This is a build summary of where things are after approximately 2000 hours (actually just over 2030 hours) of build time.
engine oil pressure sender test
Просмотров 1048 месяцев назад
Discussion about testing the analog oil pressure sender after it was replaced.
custom exhaust tips
Просмотров 1358 месяцев назад
Discussion about my custom exhaust tips and why I ordered them.
preparations to mount the strut and shaft log part 2
Просмотров 207Год назад
preparations to mount the strut and shaft log part 2
preparations to mount the strut and shaft log
Просмотров 391Год назад
preparations to mount the strut and shaft log
strut bearings and prop shaft adjustments
Просмотров 2,9 тыс.Год назад
strut bearings and prop shaft adjustments
water pickup plumbing and exhaust system
Просмотров 266Год назад
water pickup plumbing and exhaust system