- Видео 120
- Просмотров 203 626
Waagner Biro Indonesia
Индонезия
Добавлен 1 мар 2023
We chose Indonesia because at the time we had already supplied more than 70,000m of steel truss bridges through multiple soft loans directly from our workshops in Vienna and Gratz. Now those workshops do not exist anymore. But our workshop in Jakarta has become the Waagner Biro steel bridge world competence center.
We have the unique distinction of being the biggest and perhaps the only steel bridge exporter. Our bridges have been supplied and delivered to Myanmar, Papua New Guinea, Abu Dhabi, Bangladesh, Costa Rica, Singapore, and The Philippines.
HEAD OFFICE
Talavera Suite 11th Floor
Jl. Let. Jen. T.B. Simatupang Kav. 22-26
Jakarta 12430 - Indonesia
Phone (62-21) 7592 4355 (Hunting)
WORKSHOP
Kawasan Industri Modern Cikande Jl. Raya Serang Km. 68
(Jl. Modern Indonesia XVII Blok AD No.6)
Cikande Serang Banten 42186 - Indonesia
-6.198363,106.317658
Phone (62-254) 840 8013 / 840 8014 / 840 8015 / 840 8017
For more info: sellmebridges@waagnerbiro-bridgesystems.com
We have the unique distinction of being the biggest and perhaps the only steel bridge exporter. Our bridges have been supplied and delivered to Myanmar, Papua New Guinea, Abu Dhabi, Bangladesh, Costa Rica, Singapore, and The Philippines.
HEAD OFFICE
Talavera Suite 11th Floor
Jl. Let. Jen. T.B. Simatupang Kav. 22-26
Jakarta 12430 - Indonesia
Phone (62-21) 7592 4355 (Hunting)
WORKSHOP
Kawasan Industri Modern Cikande Jl. Raya Serang Km. 68
(Jl. Modern Indonesia XVII Blok AD No.6)
Cikande Serang Banten 42186 - Indonesia
-6.198363,106.317658
Phone (62-254) 840 8013 / 840 8014 / 840 8015 / 840 8017
For more info: sellmebridges@waagnerbiro-bridgesystems.com
JEMBATAN CILIMAN | TOL SERANG - PANIMBANG SEKSI 3 | STEEL U BOX GIRDER | BANTEN | 1-28 AUG 2024
Progres pemasangan U-Box Steel Girder Jembatan Ciliman di proyek jalan tol Serang-Panimbang seksi 3, Serang, Banten sampai dengan tanggal 23 Agustus 2024 oleh PT. Waagner Biro Indonesia.
Main Kontraktor: PT Sino Road and Bridge Group CO - PT Wijaya Karya (Persero) Tbk. - PT Adhi karya (Persero) Tbk. JO
Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia
Tipe: U-Box Steel Girder
Lokasi: Mekarjaya, Kec. Panimbang, Kabupaten Pandeglang, Banten
Koordinat: -6.509499,105.826048
Jembatan Sei Padang | Steel Girder: ruclips.net/p/PLDd_LMUlwSUeFIKAQYVk-hy8uVKlPapDK
Jembatan Pacongkang | Arch: ruclips.net/p/PLDd_LMUlwSUdZKp6BGu9nt8YLSeF0Xaah
Jembatan Tol Sei Wampu | Long Truss: ruclips.net/p/PLDd_LMUlwSUc5...
Main Kontraktor: PT Sino Road and Bridge Group CO - PT Wijaya Karya (Persero) Tbk. - PT Adhi karya (Persero) Tbk. JO
Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia
Tipe: U-Box Steel Girder
Lokasi: Mekarjaya, Kec. Panimbang, Kabupaten Pandeglang, Banten
Koordinat: -6.509499,105.826048
Jembatan Sei Padang | Steel Girder: ruclips.net/p/PLDd_LMUlwSUeFIKAQYVk-hy8uVKlPapDK
Jembatan Pacongkang | Arch: ruclips.net/p/PLDd_LMUlwSUdZKp6BGu9nt8YLSeF0Xaah
Jembatan Tol Sei Wampu | Long Truss: ruclips.net/p/PLDd_LMUlwSUc5...
Просмотров: 511
Видео
JEMBATAN CILIMAN | TOL SERANG - PANIMBANG SEKSI 3 | STEEL U BOX GIRDER | BANTEN | 26 JUL-1 AUG 2024
Просмотров 1,2 тыс.21 час назад
Progres pemasangan U-Box Steel Girder Jembatan Ciliman di proyek jalan tol Serang-Panimbang seksi 3, Serang, Banten sampai dengan tanggal 1 Agustus 2024 oleh PT. Waagner Biro Indonesia. Main Kontraktor: PT Sino Road and Bridge Group CO - PT Wijaya Karya (Persero) Tbk. - PT Adhi karya (Persero) Tbk. JO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: Mekarjay...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P19-P20 | 27 AGUSTUS 2024 - 02 SEPTEMBER 2024
Просмотров 3 тыс.14 дней назад
Progres pemasangan Steel Box Girder di LRT Jakarta Fase 1B (Velodrome-Manggarai) sampai dengan tanggal 02 September 2024 di Zona 1 oleh PT. Waagner Biro Indonesia secara keseluruhan telah selesai. Pemasangan Steel Box Girder di Zona 1 meliputi: 1. P1-P2-P3-P4 | (Multispan) | Perempatan Jalan Pemuda - Jl. Velodrome Ke stasiun LRT Velodrome 2. P9-P10 | Halte Busway Velodrome 3. P11-P12 | Depan Po...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P1-P2 | P19-P20 | 20 AGUSTUS 2024 - 26 AGUSTUS 2024
Просмотров 9 тыс.21 день назад
Progres pemasangan U-Box Steel Girder P1-P2 dan P19-P20 di LRT Jakarta Fase 1B (Velodrome-Manggarai) sampai dengan tanggal 26 Agustus 2024 oleh PT. Waagner Biro Indonesia. Owner: PT. Jakarta Propertindo Main Kontraktor: PT. Waskita karya (Persero) Tbk - PT. Nindya karya (Persero) - PT. Len Railway Systems KSO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: ...
JEMBATAN CILIMAN | TOL SERANG - PANIMBANG SEKSI 3 | STEEL U BOX GIRDER | BANTEN | 16-24 JULI 2024
Просмотров 1,3 тыс.28 дней назад
Progres pemasangan U-Box Steel Girder Jembatan Ciliman di proyek jalan tol Serang-Panimbang seksi 3, Serang, Banten sampai dengan tanggal 24 Juli 2024 oleh PT. Waagner Biro Indonesia. Main Kontraktor: PT Sino Road and Bridge Group CO - PT Wijaya Karya (Persero) Tbk. - PT Adhi karya (Persero) Tbk. JO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: Mekarjaya,...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P1-P2-P3 | P19-P20 | 12 AGUSTUS 2024 - 19 AGUSTUS 2024
Просмотров 3,1 тыс.Месяц назад
Progres pemasangan U-Box Steel Girder P1-P2-P3 dan P19-P20 di LRT Jakarta Fase 1B (Velodrome-Manggarai) sampai dengan tanggal 19 Agustus 2024 oleh PT. Waagner Biro Indonesia. Owner: PT. Jakarta Propertindo Main Kontraktor: PT. Waskita karya (Persero) Tbk - PT. Nindya karya (Persero) - PT. Len Railway Systems KSO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokas...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P2-P3 | P19-P20 | 06 AGUSTUS 2024 - 11 AGUSTUS 2024
Просмотров 3,1 тыс.Месяц назад
Progres pemasangan U-Box Steel Girder P2-P3, P9-P10 dan P19-P20 di LRT Jakarta Fase 1B (Velodrome-Manggarai) sampai dengan tanggal 11 Agustus 2024 oleh PT. Waagner Biro Indonesia. Owner: PT. Jakarta Propertindo Main Kontraktor: PT. Waskita karya (Persero) Tbk - PT. Nindya karya (Persero) - PT. Len Railway Systems KSO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder ...
JEMBATAN CILIMAN | TOL SERANG - PANIMBANG SEKSI 3 | STEEL U BOX GIRDER | BANTEN | 8-14 JULI 2024
Просмотров 2 тыс.Месяц назад
Progres pemasangan U-Box Steel Girder Jembatan Ciliman di proyek jalan tol Serang-Panimbang seksi 3, Serang, Banten sampai dengan tanggal 14 Juli 2024 oleh PT. Waagner Biro Indonesia. Main Kontraktor: PT Sino Road and Bridge Group CO - PT Wijaya Karya (Persero) Tbk. - PT Adhi karya (Persero) Tbk. JO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: Mekarjaya,...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P3-P4 | P9-P10 | 30 JULI 2024 - 05 AGUSTUS 2024
Просмотров 4,2 тыс.Месяц назад
Progres pemasangan U-Box Steel Girder P3-P4 dan P9-P10 di LRT Jakarta Fase 1B (Velodrome-Manggarai) sampai dengan tanggal 5 Agustus 2024 oleh PT. Waagner Biro Indonesia. Owner: PT. Jakarta Propertindo Main Kontraktor: PT. Waskita karya (Persero) Tbk - PT. Nindya karya (Persero) - PT. Len Railway Systems KSO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: P3...
JEMBATAN DIRGAHAYU | PROYEK JALAN TOL IKN SEKSI 6A | SHIPMENT | 30 JULI 2024
Просмотров 1,5 тыс.Месяц назад
Jembatan Dirgahayu merupakan jembatan bertipe pelengkung baja dengan panjang 340 meter. Pelengkung bajanya diproduksi di workshop milik PT Waagner Biro Indonesia yang berlokasi di Cikande, Serang, Banten. Struktur jembatan ini terdiri dari pondasi bored pile, pelengkung bawah beton bertulang, gelagar lantai jembatan menggunakan box girder dan pelengkung atas menggunakan baja. Pemasangan pelengk...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P3-P4 | P9-P10 | 23 JULI 2024 - 29 JULI 2024
Просмотров 3,3 тыс.Месяц назад
Progres pemasangan U-Box Steel Girder P3-P4 dan P9-P10 di LRT Jakarta Fase 1B (Velodrome-Manggarai) sampai dengan tanggal 29 Juli 2024 oleh PT. Waagner Biro Indonesia. Owner: PT. Jakarta Propertindo Main Kontraktor: PT. Waskita karya (Persero) Tbk - PT. Nindya karya (Persero) - PT. Len Railway Systems KSO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: P3-P...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P9-P10 | 16 JULI 2024 - 23 JULI 2024
Просмотров 4,2 тыс.Месяц назад
Progres pemasangan U-Box Steel Girder P9-P10 di LRT Jakarta Fase 1B (Velodrome-Manggarai) sampai dengan tanggal 23 Juli 2024 oleh PT. Waagner Biro Indonesia. Owner: PT. Jakarta Propertindo Main Kontraktor: PT. Waskita karya (Persero) Tbk - PT. Nindya karya (Persero) - PT. Len Railway Systems KSO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: Halte Busway V...
JEMBATAN CILIMAN | TOL SERANG - PANIMBANG SEKSI 3 | STEEL U BOX GIRDER | BANTEN | 1-7 JULI 2024
Просмотров 3,4 тыс.2 месяца назад
Progres pemasangan U-Box Steel Girder Jembatan Ciliman di proyek jalan tol Serang-Panimbang seksi 3, Serang, Banten sampai dengan tanggal 7 Juli 2024 oleh PT. Waagner Biro Indonesia. Main Kontraktor: PT Sino Road and Bridge Group CO - PT Wijaya Karya (Persero) Tbk. - PT Adhi karya (Persero) Tbk. JO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: Mekarjaya, ...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P14-P15 LINE A | 19 JUNI 2024 - 08 JULI 2024
Просмотров 2,7 тыс.2 месяца назад
Progres pemasangan U-Box Steel Girder P14-P15 Line A di LRT Jakarta Fase 1B (Velodrome-Manggarai) sampai dengan tanggal 7 Juli 2024 oleh PT. Waagner Biro Indonesia. Owner: PT. Jakarta Propertindo Main Kontraktor: PT. Waskita karya (Persero) Tbk - PT. Nindya karya (Persero) - PT. Len Railway Systems KSO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: Perempa...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P14-P15 LINE B | 30 JUNI 2024 - 07 JULI 2024
Просмотров 3,3 тыс.2 месяца назад
Progres pemasangan U-Box Steel Girder P14-P15 Line B di LRT Jakarta Fase 1B (Velodrome-Manggarai) sampai dengan tanggal 7 Juli 2024 oleh PT. Waagner Biro Indonesia. Owner: PT. Jakarta Propertindo Main Kontraktor: PT. Waskita karya (Persero) Tbk - PT. Nindya karya (Persero) - PT. Len Railway Systems KSO Pabrikasi dan pemasangan: PT. Waagner Biro Indonesia Tipe: U-Box Steel Girder Lokasi: Perempa...
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P18-P19 LINE B | 30 JUNI 2024 - 03 JULI 2024
Просмотров 2,2 тыс.2 месяца назад
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P18-P19 LINE B | 30 JUNI 2024 - 03 JULI 2024
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P17-P18 LINE B | 27 JUNI 2024 - 30 JUNI 2024
Просмотров 9192 месяца назад
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P17-P18 LINE B | 27 JUNI 2024 - 30 JUNI 2024
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P18-P19 LINE A | 25 JUNI 2024 - 27 JUNI 2024
Просмотров 1,6 тыс.2 месяца назад
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P18-P19 LINE A | 25 JUNI 2024 - 27 JUNI 2024
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P17-P18 LINE A | 22 JUNI 2024 - 24 JUNI 2024
Просмотров 1,4 тыс.2 месяца назад
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P17-P18 LINE A | 22 JUNI 2024 - 24 JUNI 2024
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P11-P12 LINE B | 19 JUNI 2024 - 21 JUNI 2024
Просмотров 2,6 тыс.2 месяца назад
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P11-P12 LINE B | 19 JUNI 2024 - 21 JUNI 2024
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P11-P12 LINE A | 10 JUNI 2024 - 16 JUNI 2024
Просмотров 2,8 тыс.3 месяца назад
LRT JAKARTA FASE 1B VELODROME - MANGGARAI | P11-P12 LINE A | 10 JUNI 2024 - 16 JUNI 2024
JEMBATAN RANGKA BAJA SAMPANG | 2xB50 | PATI | JAWA TENGAH
Просмотров 1083 месяца назад
JEMBATAN RANGKA BAJA SAMPANG | 2xB50 | PATI | JAWA TENGAH
JEMBATAN RANGKA BAJA KALI BULANAN | 1xB60 | WELERI | KENDAL | JAWA TENGAH
Просмотров 1053 месяца назад
JEMBATAN RANGKA BAJA KALI BULANAN | 1xB60 | WELERI | KENDAL | JAWA TENGAH
PROSES ASSEMBLY U BOX GIRDER DI WORKSHOP PT WAAGNER BIRO INDONESIA
Просмотров 1,1 тыс.3 месяца назад
PROSES ASSEMBLY U BOX GIRDER DI WORKSHOP PT WAAGNER BIRO INDONESIA
JEMBATAN P8-P9 | TOL SEMARANG DEMAK | SEMARANG | JAWA TENGAH | PROSES PRA ASSEMBLY | 04 MEI 2024
Просмотров 2443 месяца назад
JEMBATAN P8-P9 | TOL SEMARANG DEMAK | SEMARANG | JAWA TENGAH | PROSES PRA ASSEMBLY | 04 MEI 2024
WAAGNER BIRO INDONESIA | REVIEW 2023 | CARUNGGO | KALIGAWE | PACONGKANG | SEI PADANG | SEI WAMPU
Просмотров 4268 месяцев назад
WAAGNER BIRO INDONESIA | REVIEW 2023 | CARUNGGO | KALIGAWE | PACONGKANG | SEI PADANG | SEI WAMPU
JEMBATAN KALIGAWE | TOL SEMARANG DEMAK 1A | JAWA TENGAH | PROGRESS 23 NOVEMBER 2023
Просмотров 9659 месяцев назад
JEMBATAN KALIGAWE | TOL SEMARANG DEMAK 1A | JAWA TENGAH | PROGRESS 23 NOVEMBER 2023
JEMBATAN KALIGAWE | TOL SEMARANG DEMAK 1A | JAWA TENGAH | PROGRESS 19 NOVEMBER 2023
Просмотров 1,2 тыс.9 месяцев назад
JEMBATAN KALIGAWE | TOL SEMARANG DEMAK 1A | JAWA TENGAH | PROGRESS 19 NOVEMBER 2023
JEMBATAN CARUNGGO | KABUPATEN SEMARANG | JAWA TENGAH | 2023
Просмотров 3519 месяцев назад
JEMBATAN CARUNGGO | KABUPATEN SEMARANG | JAWA TENGAH | 2023
JEMBATAN KALIGAWE | TOL SEMARANG DEMAK 1A | JAWA TENGAH | PROGRESS 12 NOVEMBER 2023
Просмотров 6 тыс.10 месяцев назад
JEMBATAN KALIGAWE | TOL SEMARANG DEMAK 1A | JAWA TENGAH | PROGRESS 12 NOVEMBER 2023
Alhamdulillah sehat semua dan berjaln dgn lancar 🤲
woow semoga cepat beres..salut buat pekerja
Stasiun transit lrt manggarai
Ini LRT dari kelapa gading ya ke velodrone.
Masya Allah cepat sekali progres nya😊, smga cepat slesai dan beroprasi. Saya orang bandung iri dgn kemajuan transportasi umum dijakarta. Bandung trlalu primitif ga punya transportasi berbasis rel seperti ini.
Kasihan bandung trtinggl 20 thun sm jakarta,,ayo dong bndung jgn kalah sama bali,palembng aja sdh ada..bali bntar lg lg buat lrt,,kota2 d indonesia tertinggl ni..surabaya,djogja,solo,semarang harus y ada lrt/mrt...lambat sgt
Jakarta nggak ada aniesnya langsung tancap gas, normalisasi sungai langsung di gas, rute LRT dan MRT lanjut lagi.. semoga jakarta semakin keren..
Min tiang penyanggah buat stasiun apa ukuran nya sama?
Ini beneran bulan ini test track?
Kenapa jaman Anies gak d bangun sih, jadi ya pembangunannya terlambat
tahun 2019 anies menghapus rute velodroe-manggarai dan merubah rute ke klender.
@@foxstargazer5120 gak d bangun bangun ya...
Kalau lanjut nggak bisa pansos, terkesan keberlanjutan. Nggak apa2 lah, yg penting masa kelam dah lewat. saatnya memulai membangun lagi.
Semoga gubernur Jakarta yang baru nanti akan melanjutkan pembangunan LRT + MRT + KRL agar tranportasi masal fi jakarta dapat terkoneksi dengan maksimal.
kenapa ga bikin stasiun di sekitar perempatan Jln Ahmad Yani - Jln Pramuka ? kan maksud nya biar integrasi tuh sama Busway
Maju dan sukses terus pembangunan infrastruktur. Maju terus bangsa Indonesia 🇮🇩
Update drone bukannya dr kontraktor utamanya, tp dr vendornya.. 😅
Dia update sesuai projectnya aja ko, kalo dari owner proyeknya bisa diliat di channel waskita or jakpro
@@ihsanino2241 iya masalahnya ga update2 itu.. tdnya ada yg dari KSO WNL, tapi editornya nyerah kayanya disuruh update tiap minggu
@@rayforisa88 oalah…tapi ya kalo menyangkut waskita mah banyakan mandeknya 😆
@@rayforisa88update tiap minggu ya wajib si itu klo di proyek kan progres mingguan. Dokumentasi juga wajib itu.
Kalau bukan karena waagner biro saya belum tentu dapat informasi sedetail ini 😅
keren nih videonya. enak dilihat progressnya.
Kita warga disana yg menderita kemacetan 😅
@@ikaalamsyah5650 iya yah om. Saya juga sebenarnya tiap hari lewat situ cuma berangkatnya masih pagi banget, jadi belum terlalu ngerasain macetnya. Mudah2an bisa cepet selesai deh supaya lancar kembali. 😀
untung Anis ng jadi masuk pemilihan gubernur ..klo ini kan pasti jadi siapapun gubenurnya proyek LRT
Hrsnya mulai saat ini batasi pengguna kendaraan bermotor terutama mobil dan perbnyk trotoar
Maju dan sukses terus pembangunan infrastruktur. Tetap sehat semua para pekerja nya. Maju terus bangsa Indonesia 🇮🇩
Alhamdulillah..... Bisa naik LRT dari Bekasi ke Unj Rawamangun.....
Jakarta kalau gk ada Anies, yakin transportasi2 kayak gini cepet. Kalau ada Anies, duit mending bikin jalur sepeda, stadiun yg gk kepake, sama formula A yg pembalap nya 1 pun gak ada yang tahu. 😂
Covid dan dulu rute ini ditolak sama menhub
@@MaksapataRajs tapi JIS dan Formula A jalan?
@@MaksapataRajsditolak karena bukan rute yg ini
Cepat sekali pembangunan nya keren pernah tinggal daerah pramuka tak terasa waktu berlalu ada LRT .jaman metro mini sekarang makin modern
SEMOGA ADA LRT ATAU MRT YG SAMPE PIK 2 DAN BSD TANGSEL
Alhamdulillah Mantab om Admin Semoga lancar pembangunannya.
Jalan tol Serang - panimbang.semakin oke...
Kalau menurut saya akan lebih baik jika transfortasi publik di Indonesia di bikin seperti ini semua 👍🏻 mulai dari kereta, busway, maupun angkot. Biar ga mengganggu kendaraan pribadi 👍🏻 jadi arus lalulintas bakalan lancar tidak menggangu kendaraan pribadi maupun sebaliknya kendaraan angkutan publik juga tidak menggangu pengguna angkutan pribadi 😊
Akhrinya 19 ke 20 sedikit lagi
Trimakasih info Nya Bung Semoga Cepat Selesai projek LRT di jakarta
Diatas perempatan sunan giri tinggal 3 blok lagi yang sebelah utara. Lanjut pemasangan di depan sekolah labschool, jadi deh jalur yg dijalan pemuda. Sayang yg di jl pramuka kesannya lemot. Belum ada satupun tiang beton yang berdiri. Malah dekat rel kereta yg lokasinya sempit sdh mulai naik tiangnya.
yg di pasar rumput juga blm di apa apain padahal lokasinya udh di tutup setahun yg lalu
Wah iya kalau ditutup tapi sepi bikin keki yg lewat.@@Prasetyoooo
dokumentasi waagner biro lebih keren dari kontraktor utama
Jangan salah Selain Tentara bayaran di Rusia PMC Waggner biro juga punya jasa konstruksi
@@rizkybayupandawa87itu pmc wagner pak, a nya cuma 1 wkwk
Betul. Setiap video proses insfratruktur mereka itu rasanya benar-benar company bgt 😂
@@NozomiExpres padahal tim media abangnya (MRTJ) juga keren banget kalo ngasih progres bulanan
Luaar Biaasa Pekerjaan Nya. Proyek Negara Indonesia
per 21 agustus 2024 dua jalur sudah terhubung ke stasiun LRT Velodrome, luar biasa inovasi Waagner Biro, dengan over hang (P1-P3) sepanjang itu tidak memerlukan tiang ditengahnya, mempercepat proses pembangunan. Tapi alangkah baiknya kalau alat berat setelah selesai dipinggirkan semaksimal mungkin, supaya tidak mengganggu lalu lintas, apalagi dekat situ banyak sekolah, merepotkan kami yang mengantar anak sekolah, apalagi tidak terlihat petugas di perempatan balai pustaka dengan kayu jati v di jam berangkat anak sekolah, semrawut sekali lalinnya
Tinggal P19 sama P20 nya?
Yang steel box girder p9-p10 di atas halte TJ, itu panjang banget, sampai skrg masih disangga tiang besi walau sudah tersambung sempurna.
Terimakasih pak Heru..
@@AbdulMalik-dh6dw kl ini udah berarti kemungkinan test track di bulan September bisa kekejar ya? di beberapa video sudah ada pemasangan rel
@@marchingaddict iya akhir bulan 9 katanya
Melingkar
Klp gading Manggarai dukuh atas palmerah tnh abang kota ancol klp gading
Nice video 👍
semoga KRL pun saling terintegrasi spti LRT dan MRT... misal Citayam - Nambo tersambung at terintegrasi dg Stasiun Bekasi, Tambun at Cikarang via Jonggol dan Stasiun Pesing - Tangerang tersambung at terintegrasi dg Stasiun Tenjo, Tiga Raksa, Maja at Rangkasbitung serta jalur Alternatif baru Stasiun Tenjo, Tiga Raksa, Maja at Rangkasbitung dg Stasiun Bogor Kota via Jasinga, Leuwiliang, Ciampea, Dramaga IPB, Laladon, Gunung Batu hingga Bogor Kota.... semoga... Aamiin yra....
PMC RUSIA 🗿
Iya Waggner kan tentara bayaran pak Vladimir Putin
Btw waagner prusahaan dri austria ngab
Menit 2:22-2:24..itu tiang penyangga steel box girder yg ada di depan halte TJ, apakah akan dibongkar atau permanen?
Dilepas atuh.
Kalau baca di IG FDTJ ada planing extension dari stasiun velodrom ke stasiun LRT Pemuda menuju rute Halim, harusnya di titik lengkung tersebut sekalian dibuat expansion joinnya, hingga ketika pembangunan fase menuju halim dilaksanakan bisa langsung join, tapi kalau dilihat dimensi pearheadnya sepertinya tidak mengakomodir rencana tsb,
Nah itu yang saya tunggu-tunggu, jadi biar sekalian gak bongkar lagi
Kaya petanya ga update dh.. terakhir infonya utk ke arah halim startnya dr rawamangun, bukan velodrom.. jd dr rawamangun akan ada yg lurus ke arah jiep, trus belok ke kanan ke arah klender dan lanjut ke halim
@@rayforisa88 kalau lihat tayangan progres stasiun lrt rawamangun titiknya sudah sempit begitu, berarti nanti ada double jalur pararel menuju st. pemuda Kenapa gak bangun Y shape saja ya, tinggal extend, lebih murah lebih praktis tinggal konect
@@Eionsnodes ya mohon maaf ya, bukan saya juga yg bangun.. mereka juga pasti udh itung2 pake FS utk proyek2 kedepannya gimana.. bisa jadi penggunaan girder baja utk mempermudah juga pembangunan jalur kedepannya.. sama mungkin kalau lgsg belok kiri dr velodrome, itu kan ada halte TJ dan jembatannya ya.. mungkin mereka kesulitan harus taro pilarnya dimana krn posisi jponya juga mayan tinggi..
@@rayforisa88 Y shape itu maksudnya dari arah st rawamangun menuju rencana st. Pemuda track lurus, dari st. Velodrom ke st. Rawamangun track lengkung, interseksinya di pilar depan mall orion itu, cukup buat extension join pada girder baja sekarang, Cuma ya itu ukuran pierhedanya sepertinya gak akomodir model tsb Tapi ya sudah sudah dibuat spt itu Di dunia perencana dulu (tst) ada anekdot "kalau bisa dibuat mahal, ngapain dibuat murah" gedein profil dan volume diantara modus2nya, itu dulu Sekarang lagi rameh juga temuan pada kasus toll mbz
Itu kenapa pada sambungan lengkung ke stasiun velodrom gak skalian dengan Y shape steel girdernya, atau minimal ada extension joinnya agar pada saat extension ke halim nanti, gak bongkar pasang lagi, tks
akhirnya indonesia sadar akan kebutuhan mrt lrt ini... kebangetan singapura udah nguler kemana2 keretanya, naik mobil pribadi udah kaga perlu, kita masih perlu naik motor mobil atau dikasih angkot yang busuk...
how moch progress fabrication
i stanbay job completed
halo evry one becerfull yous ection erection dept qc i love somuch
good morning halo evry one becerfull yours ection erction famly stanby inhome ex qc inspektor
Dmn almt ktr dan tlp nya ya.semoga sukses dan barokah
Seneng liat progressnya. Semoga cpt selesai,
Menit 4:06 ada beton yg udh keropos, ga bahaya ta?
Bukan keropos itu mas, tapi hasil cetak coran betonnya gak rata. Nanti saat finishing dihaluskan lagi.
@@MBagas-kv4dgoh siap makasih infonya 👍
akhirnya dapat visualisasi plus detail apa saja yang terkait dengan jalur LRTJ dari pilar 1B sampai dengan pilar di area tol Wiyoto Wiyono
Kalau Flensa girder beam bagian bawahnya bisa dibuat rata dengan webnya itu akan lebih baik, sebab ada nongol sedikit itu miliki pengaruh estetik besar 1. Tempat bersarang debu, Flex dan kotoran lain 2. Tempat percikan air menggenang tampiasan ketika hujan lebat, dan kombinasi air dan debu bisa bersifat oxidatif 3. Bahkan kalau bisa shaping Gridernya dibuat Trapesium serupa Girder betonnya akan lebih estetik juga 4. Mudah-Mudahan Steel Girdernya juga sudah difinish Coating Hydrophobic dan dust proof Tks
Nungguin update dr yg punya proyek kaga ada2.. akhirnya nonton dr vendornya aja..
@@rayforisa88 sama dong kaya saya 🤣 Mengandalkan channel ini buat referensi
Trimakasih info Nya Sob
Kenapa pake nya besi baja ga pake beton. Kpk tolong pantau