(काठमाडौं निजगढ द्रुतमार्ग)-AERIAL VIEW|KTFT-CP3| SECTION:CH 49+800 TO CH 51+420
#ktft #fasttrack #nepal #kathmanduteraifasttrack
Contract Name Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works (CH: 49+800 - CH:57+400, 7.6 Km)
Salient Features:
Contract No. :KTFT/ICB/Works/R&B/078/079/3
Contractor :M/S Kumar-Roshan-Sichuan JV, Chandol, Kathmandu-4
Employer: Kathmandu-Terai/Madhesh-Fast Track (Expressway) Road project Nepali Army Bhadrakali, Kathmandu, Nepal
Engineer M/S Yooshin-KEC-Pyunghwa JV in association with GIDAN-Sitara
Pvt. Ltd. Nepal
Date of Commencement: 31st Jan 2022
Original Contract Period: 33 Months 1000 days from the date of commencement
Original Completion Date: 26th October 2024
Defects Notification Period: 1825 day...
Просмотров: 54

Видео

(काठमाडौं निजगढ द्रुतमार्ग)-|KTFT| CONSTRUCTION OF FCM BRIDGES
Просмотров 2,8 тыс.Месяц назад
#ktft #fasttrack #nepal #kathmanduteraifasttrack Bridge Construction By Free Cantilever Method(FCM) in Nepal. #fcmbridge #piertable #pioneer #kathmandu_tarai_fast_track_construction #KTFT​ #fasttracknepal​ #tunnelconstruction #Prosperity #fasttracknepal #megaprojects #kathmandu​ #fasttrack​ #megaprojects​ #KathmanduTeraiFastTrack​ #NepalInfrastructure​ #GameChangerTransportation​ #fast​ #track​...
(काठमाडौं निजगढ द्रुतमार्ग)-AERIAL VIEW|KTFT-CP3| SECTION: CH 51+420 CH 52+670
Просмотров 14 тыс.Месяц назад
#ktft #fasttrack #nepal #kathmanduteraifasttrack Contract Name Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works (CH: 49 800 - CH:57 400, 7.6 Km) Salient Features: Contract No. :KTFT/ICB/Works/R&B/078/079/3 Contractor :M/S Kumar-Roshan-Sichuan JV, Chandol, Kathmandu-4 Employer: Kathmandu-Terai/Madhesh-Fast Track (Expressway) Road project Nepali Army ...
(काठमाडौं निजगढ द्रुतमार्ग)-AERIAL VIEW|KTFT-CP3| APRIL 2024
Просмотров 4,4 тыс.Месяц назад
#ktft #fasttrack #nepal #kathmanduteraifasttrack Contract Name Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works (CH: 49 800 - CH:57 400, 7.6 Km) Salient Features: Contract No. :KTFT/ICB/Works/R&B/078/079/3 Contractor :M/S Kumar-Roshan-Sichuan JV, Chandol, Kathmandu-4 Employer: Kathmandu-Terai/Madhesh-Fast Track (Expressway) Road project Nepali Army ...
(काठमाडौं निजगढ द्रुतमार्ग)-Installation of Asphalt Hot Mix Plant| ECO TEC 80| KTFT-CP3
Просмотров 1,9 тыс.Месяц назад
#ktft #fasttrack #nepal #asphaltplant Contract Name Construction of Double Lane Dual Carriageway Standard Expressway Road, Bridge and Allied Works (CH: 49 800 - CH:57 400, 7.6 Km) Salient Features: Contract No. :KTFT/ICB/Works/R&B/078/079/3 Contractor :M/S Kumar-Roshan-Sichuan JV, Chandol, Kathmandu-4 Employer: Kathmandu-Terai/Madhesh-Fast Track (Expressway) Road project Nepali Army Bhadrakali,...
Futuristic KTFT -Gemini
Просмотров 1084 месяца назад
Futuristic KTFT -Gemini
Kathmandu Terai /Madhesh Fast Track Project(काठमाडौं निजगढ द्रुतमार्ग)| Image Show by Gemini
Просмотров 1,5 тыс.4 месяца назад
#ktft #fasttrack #nepal A image show of Fasttrack Project Nepal sourced by Gemini. It includes the construction activities of fast track Nepal. Please enjoy. Source: Google Gemini Other related links to #fasttrack : ruclips.net/video/JeApuXnXwVk/видео.htmlsi=t-RDWm-8wD0MBU_P www.ratopati.com/story/412217/fast-track-tunnel-way #kathmandu_tarai_fast_track_construction #KTFT​ #fasttracknepal​ #tun...
Kathmandu Terai /Madhesh Fast Track Project(काठमाडौं निजगढ द्रुतमार्ग)| Photo Gallery |19 FEB 2024
Просмотров 2,4 тыс.5 месяцев назад
Kathmandu Terai /Madhesh Fast Track Project(काठमाडौं निजगढ द्रुतमार्ग)| Photo Gallery |19 FEB 2024
Kathmandu Terai /Madhesh Fast Track Project(काठमाडौं निजगढ द्रुतमार्ग)-Contract Pkg#3| Bird Eye View
Просмотров 8325 месяцев назад
Kathmandu Terai /Madhesh Fast Track Project(काठमाडौं निजगढ द्रुतमार्ग)-Contract Pkg#3| Bird Eye View
Pile Integrity Test (PIT) | PIT(Pile Integrity Test) Application and Data Interpretation(PART-II)
Просмотров 658 месяцев назад
Pile Integrity Test (PIT) | PIT(Pile Integrity Test) Application and Data Interpretation(PART-II)
Jajarkot Earthquake 2023|Glimpses of devastation
Просмотров 108 месяцев назад
Jajarkot Earthquake 2023|Glimpses of devastation
Nepal Qualified for T20 World Cup 2024| Historic moment
Просмотров 178 месяцев назад
Nepal Qualified for T20 World Cup 2024| Historic moment
Nepali Engineer sharing his engineering practice of Hong Kong.🏗
Просмотров 298 месяцев назад
Nepali Engineer sharing his engineering practice of Hong Kong.🏗
Pile concreting by tremie method.
Просмотров 94Год назад
Pile concreting by tremie method.
Installation of Rebar cage of Pile
Просмотров 28Год назад
Installation of Rebar cage of Pile
Kathmandu Terai/Madhesh Fast Track Project(काठमाडौं निजगढ द्रुतमार्ग )
Просмотров 2,6 тыс.Год назад
Kathmandu Terai/Madhesh Fast Track Project(काठमाडौं निजगढ द्रुतमार्ग )
Piling Work Method | Mahakali Bridge Project | Cast In situ Bored Piles| Piling Rig Machine
Просмотров 4232 года назад
Piling Work Method | Mahakali Bridge Project | Cast In situ Bored Piles| Piling Rig Machine
Precast Cover slabs| Mahakali Bridge Project|
Просмотров 472 года назад
Precast Cover slabs| Mahakali Bridge Project|
Aerighat Section- Mahakali Bridge Project -Kanchanpur as of 25 Feb'22
Просмотров 5592 года назад
Aerighat Section- Mahakali Bridge Project -Kanchanpur as of 25 Feb'22
Flood hit Mahakali Bridge Project on May/June'21
Просмотров 1132 года назад
Flood hit Mahakali Bridge Project on May/June'21
Post Prestressing Program Ceremony @MBP( 800×2= 1600 m Long Prestressed Box Girder Bridge)
Просмотров 1103 года назад
Post Prestressing Program Ceremony @MBP( 800×2= 1600 m Long Prestressed Box Girder Bridge)
Mahakali Bridge Project-Asian Highway Standard, MNR,Nepal.
Просмотров 12 тыс.3 года назад
Mahakali Bridge Project-Asian Highway Standard, MNR,Nepal.
Mahakali Bridge Project-Asian Highway Standard, MNR,Nepal.
Просмотров 8 тыс.3 года назад
Mahakali Bridge Project-Asian Highway Standard, MNR,Nepal.
Introduction to Underconstruction Mahakali Bridge Project ,Mahendranagar Kanchanpur, Nepal
Просмотров 4483 года назад
Introduction to Underconstruction Mahakali Bridge Project ,Mahendranagar Kanchanpur, Nepal
Introduction to Underconstruction Mahakali Bridge Project ,Mahendranagar Kanchanpur, Nepal.
Просмотров 4023 года назад
Introduction to Underconstruction Mahakali Bridge Project ,Mahendranagar Kanchanpur, Nepal.
/// 14 Habits that make You Stress Free///
Просмотров 443 года назад
/// 14 Habits that make You Stress Free///
144'' Long Python Found at Bridge Construction Site
Просмотров 3033 года назад
144'' Long Python Found at Bridge Construction Site
Photography at its Best!!!
Просмотров 864 года назад
Photography at its Best!!!
How to know The Prism Constant of TS-reflecting prism(Part-II)
Просмотров 4244 года назад
How to know The Prism Constant of TS-reflecting prism(Part-II)

Комментарии