Van der Wiel Bouw
Van der Wiel Bouw
  • Видео 19
  • Просмотров 669 586
Parkeergarage de Meelfabriek - Timelapse 2019
Parkeergarage de Meelfabriek - Timelapse 2019
Просмотров: 5 126

Видео

Timelapse werkzaamheden Parkeergarage 2019 in 45 fps
Просмотров 1,2 тыс.4 года назад
Timelapse werkzaamheden Parkeergarage 2019 in 45 fps
Leegpompen bouwkuip parkeergarage Meelfabriek Leiden
Просмотров 1,1 тыс.4 года назад
Leegpompen bouwkuip parkeergarage Meelfabriek Leiden
Timelapse parkeergarage Meelfabriek 1e helft 2019
Просмотров 4,8 тыс.5 лет назад
Timelapse parkeergarage Meelfabriek 1e helft 2019
Timelapse werkzaamheden Meelfabriek 2018
Просмотров 4,3 тыс.5 лет назад
Timelapse werkzaamheden Meelfabriek 2018

Комментарии

  • @luukasportfors9414
    @luukasportfors9414 2 года назад

    Very cool and nice timelapse!

  • @garytischik7350
    @garytischik7350 4 года назад

    Hi i live in Armstrong BC Canada been watching for 5 months now the dutch are unbelievable builders love to go there one day on my bucket list

    • @vanderwielbouw9739
      @vanderwielbouw9739 4 года назад

      Nice to hear we have viewers from Canada. Thanks for your compliments.

  • @BlueBORG
    @BlueBORG 5 лет назад

    Ik begrijp het niet ... Waarom al de sortering dan het vuil eruit halen, vul het met water en doe er dan wat eruit ziet als steen erin terug. Ik kom uit de Verenigde Staten en bekijk deze feed nu al een paar maanden ... erg interessant ..

  • @BlueBORG
    @BlueBORG 5 лет назад

    I don't understand... Why all the grading then take dirt out fill it with water then put what looks like rock back into it. I'm from the United States have been watching this feed for a couple months now.. very interesting..

    • @vanderwielbouw9739
      @vanderwielbouw9739 5 лет назад

      Great to read that you are watching us from across the ocean! First of all sheet piles were put in the ground around the building site to excavate dirt for first 5-6m. To stabilize the sheet piles braces we’re put in at two levels after this site was filled up with water because sheet piles are not 100% watertight and to create a dry site drainage has to be installed which has some difficulties. Because of the ground water level in the surrounding area water pressure on the sheet piles is big and also drainage will cause the ground water levels to drop outside the building site which will cause problems with foundations of existing buildings near our site. After site was filled excavation was continued to about 11-12 meters deep which is finished now. In recent weeks a gravel bedrock was applied on the bottom on which a concrete slab will poured which functions as a plug to keep water out of the building site. Concrete will be poured underwater. After the curing of the concrete slab water will be pumped out of the building site. On top of the concrete slab there will be a layer of sand, because concrete layer isn’t completely flat, on which the lowest floor of the parking garage will be created. Hope this clarifies the activities on the site. Kind regards, Van der Wiel Bouw bv

    • @BlueBORG
      @BlueBORG 5 лет назад

      @@vanderwielbouw9739 Thank you for the quick reply... makes it very clear now.. :)