sesq171
sesq171
  • Видео 16
  • Просмотров 5 078
// X18SEA driven on Uckfield - Crowborough RRP // 13/10/2024
Probably the most unexpected bus for the day, but I wasn't complaining. This specific B7TL was crazy loud, I genuinely thought it was broken. Here it is being driven on Rail Replacement between Uckfield and Crowborough, which goes through 50-70mph roads.
Просмотров: 29

Видео

// SF03SEA driven on Uckfield - Crowborough Rail Replacement // 13/10/2024
Просмотров 6412 часов назад
In this video is Seaford & District's SF03SEA being driven on Uckfield to Crowborough rail replacement, on Sunday 13 October 2024. Considering TUK have recently taken over GTR Rail Replacement, I'd always thought that most coach companies out there would be going crazy all over Southern/Thameslink/Great Northern rail replacement. On this day, my view was changed when 2 Metrobus Enviro 200s, a S...
// Train Horn Compilation // Part 1
Просмотров 245День назад
// Train Horn Compilation // Part 1
SK07DZB // Kickdown on Purley - Redhill Rail Replacement // 22/09/24
Просмотров 7728 дней назад
First time seeing Redhill rail replacement, and I see why I've heard it's good. This Enviro 400 I rode is Ex Epsom Coaches, with a Go Coach livery but not even operated by Go Coach.
92032 coasting past Kemsing on 0Z33 28/07/2024 + 2 Maidstone East Networkers
Просмотров 326Месяц назад
Finally got to see a 92 move on this line after missing them due to my own issues. I love these locos, from the way they look to their sounds. Here is 92032 passing Kemsing in GBRf livery.
Spa Valley Railway Summer Diesel Gala 2024 Highlights!
Просмотров 8332 месяца назад
Probably the best weekend I've went through. 33202 and 31430 were personally my favourite in the gala. They both brought outstanding performances and sounded brilliant. 50021 was there too to also bring an amazing performance. I've enjoyed every second of seeing it at the Spa Valley. 2/08/24 - 4/08/24 Spa Valley Railway
92015 + 92041 passes Westenhanger on HS1 | 31/05/2024
Просмотров 4954 месяца назад
0L22 is a move that is done on HS1 by these Class 92s. This move happens every Friday, and this is my first time seeing it. The closest I have seen to this move is 6L22, which was another HS1 move except it is done while having something hauled, like the Class 756s were getting dragged through HS1 back in 2023!
Trains at: Sevenoaks, Otford, Kemsing | 20/01/2024
Просмотров 6599 месяцев назад
Was supposed to see a Class 92, but unfortunately it didn't run that day and it still hasn't. Despite that, it was still a fun day. Locations: Sevenoaks Kemsing (Cockneys Foot Crossing) Otford Camera: Panasonic Lumix DC-FZ82
Trains at Eridge 23/10/2023 (ft. 73201 + 73119 RHTT)
Просмотров 15111 месяцев назад
Eridge station is located in East Sussex, and is on the Oxted line. It is also a terminus for the heritage railway, Spa Valley Railway. This video includes 3 171s and an RHTT. Enjoy! Tiktok: www.tiktok.com/@southeasternsqu1dge Twitter: squ1dgeNSE Flickr: www.flickr.com/photos/197053930@N07/
73119 and 73201 departing Crowborough working 3W91 / 8/10/2023
Просмотров 156Год назад
After 3W90's service had probably been cut short, GBRF had put up another RHTT, 3W91 to cover up for it. At that time, 3W91 was consisted of 73119 and 73201. Here is 3W91 leaving Crowborough for Tonbridge West Yard. Enjoy! Tiktok: www.tiktok.com/@southeasternsqu1dge Twitter: squ1dgeNSE Flickr: www.flickr.com/photos/197053930@N07/
A Few Minutes of Arriva Kent & Surrey Kickdown-ish
Просмотров 143Год назад
A Few Minutes of Arriva Kent & Surrey Kickdown-ish
Southeastern Trains at Tunbridge Wells and High Brooms 4/07/2023 (60FPS)
Просмотров 887Год назад
Both stations owned by Southeastern, they are located in the county of Kent. 60FPS Camera used: IPhone 13 Extras: None
73962 + 73963 Track Inspection Train at: Crowborough Station (60FPS)
Просмотров 124Год назад
Here is a 73 Track Inspection Train at Crowborough, with a cheeky 171 making it into the video too. 60FPS Recorded with: IPhone 13 Extra Info: Tripod Used
*A26 ROARS* / YN57FYJ on Route 29 - Crowborough - Tunbridge Wells (Scania N270UD Omnidekka)
Просмотров 728Год назад
Roaring along the A26, beautiful buses these are.
Route 285: Heathrow Airport Central - Kingston E400MMC 7/05/23
Просмотров 94Год назад
dodgy day but fun
Trains at Wivelsfield 29/04/23
Просмотров 116Год назад
Trains at Wivelsfield 29/04/23

Комментарии

  • @cannadineboxill-harris2983
    @cannadineboxill-harris2983 5 дней назад

    I needed to know why they couldn’t dig a tunnel and do an extension for most of the mainline Trains so that they could extend the unused abandoned underground train stations. Why couldn’t they use the part D78 Stock train doors on the sides and also restructure the front face of the A60 and A62 stock which will include the class 507, class 508, class 313, class 314 and class 315 remix and make them all together and also redesign all of them into an overhead wire line trains and also make most of them into Five carriages per units and also having three Disabled Toilets on those Five cars per units A60 and A62 stock trains and also convert the A60 and A62 stock trains into a Scania N112, Leyland 510, Gardner 6LXC, Cummins M11, Volvo B10M, Gardner 6LXB, Gardner LG1200 and Gardner 8LXB Diesel Engines and also put the Loud 7 Speed Voith Gearboxes even Loud 10 Speed Leyland Hydra cyclic Gearboxes in the A60 and A62 stock, class 507, class 508, class 313, class 314, and class 315 and also modernise the A60 and A62 stock and make it into 11 carriages per unit so it could have fewer doors, more tables, computers and mobile phone chargers? A Stock Train and 8 Disabled Toilets on those A stock trains. why couldn’t we refurbish and modernise the waterloo and city line Triple-Track train tunnel and make it even much more Larger and extend it to the bank station, making it into a Triple-Track Railway Line so those Five countries such as Australia, Germany, Italy, Poland And Sweden to convert the waterloo and city line Triple-Track Railway tunnel into a High-Speed Railway lines? The Third Euro tunnel Triple-Track Railway line to make it 11 times better for passengers so they could go from A to B. Then put the modernised 11 carriages per unit A Stock and put them on a bigger modernised Waterloo and city line Triple-Track train tunnel so it could go to bank station to those Five countries such as Australia, Germany, Italy, Poland And Sweden. The modernised refurbished 11 carriages per unit A stock could be a High Speed The Third Triple-Track Euro Tunnel Train So it is promising and 47 times a lot more possible to do this kind of project if that will be OK for London Australia, Germany, Italy, Poland And Sweden. oh by the way, could they also tunnel the Triple-Track Railway Line so it will stop from Buckinghamshire, Hertfordshire and Essex so that the Passengers will go to Australia, Germany, Italy, Poland and Sweden and also extend the Triple-Track Railway Line from the Bank to Buckinghamshire, Hertfordshire and Essex Stations so that more people from there could go to Australia, Germany, Italy, Poland And Sweden more Easily. Why couldn't they extend the Piccadilly Line and also build brand-new underground train stations so it could go even further right up to Clapton, Wood Street can they also make another brand new underground train station in Chingford and could they extend the Piccadilly Line and the DLR right up to Chingford? All of the classes 150, 155, 154, 117, 114, 105, and 106, will be replaced by all of the Scania N112, Leyland 510, Gardner 6LXC, Cummins M11, Volvo B10M, Gardner 6LXB, Gardner LG1200 and Gardner 8LXB Diesel Five carriages three disabled toilets are air conditioning trains including Highams Park for extended roots which is the Piccadilly line and the DLR trains. Could you also convert all of the 1973 stock trains into an air-conditioned maximum speed 78 km/hours (48 MPH) re-refurbished and make it into a 8 cars per unit if that will be alright, and also extend all of the Piccadilly train stations to make more space for all of the extended 8 car per unit 1973 stock air condition trains and can you also build another Mayflower and Tornado Steam Locomotive Companies and can they order Every 87 Octagon and Every 48 Hexagon shape LNER diagram unique small no.13 and unique small no.11 Boilers from those Countries such as Greece, Italy, Poland, and Sweden, can they make Mayflower and Tornado Steam Locomotive speeds by up to 147MPH so you can try and test it on the Original Mainline so it will be much more safer for the Passengers to enjoy the 147MPH speed Limit only for HS2 and Channel Tunnel mainline services, if they needed 16 Carriages Per units, can they use those class 55’s, class 44’s, class 40’s and class 43HST Diesel Locomotive’s right at the Back of those 18 Carriages Per Units so they can take over at the Back to let those Mayflower and Tornado Steam Locomotive’s have a rest for those interesting Journeys Please!!!!, oh can you make all of those 18 Tonne Boxes of Coal for all of those 147MPH Mayflower and Tornado Steam Locomotive’s so the Companies will Understand us PASSENGER’S!!!! So please make sure that the Builders can do as they are told!!!!!!!! And PLEASE do something about these very very important Professional ideas Please? Prime Minister of England, Prime Minister of Australia, Prime Minister of Sweden, Prime Minister of Germany, Prime Minister of Italy, Prime Minister of Poland and that Includes the Mayor of London.

  • @cannadineboxill-harris2983
    @cannadineboxill-harris2983 5 дней назад

    I needed to know why they couldn’t dig a tunnel and do an extension for most of the mainline Trains so that they could extend the unused abandoned underground train stations. Why couldn’t they use the part D78 Stock train doors on the sides and also restructure the front face of the A60 and A62 stock which will include the class 507, class 508, class 313, class 314 and class 315 remix and make them all together and also redesign all of them into an overhead wire line trains and also make most of them into Five carriages per units and also having three Disabled Toilets on those Five cars per units A60 and A62 stock trains and also convert the A60 and A62 stock trains into a Scania N112, Leyland 510, Gardner 6LXC, Cummins M11, Volvo B10M, Gardner 6LXB, Gardner LG1200 and Gardner 8LXB Diesel Engines and also put the Loud 7 Speed Voith Gearboxes even Loud 10 Speed Leyland Hydra cyclic Gearboxes in the A60 and A62 stock, class 507, class 508, class 313, class 314, and class 315 and also modernise the A60 and A62 stock and make it into 11 carriages per unit so it could have fewer doors, more tables, computers and mobile phone chargers? A Stock Train and 8 Disabled Toilets on those A stock trains. why couldn’t we refurbish and modernise the waterloo and city line Triple-Track train tunnel and make it even much more Larger and extend it to the bank station, making it into a Triple-Track Railway Line so those Five countries such as Australia, Germany, Italy, Poland And Sweden to convert the waterloo and city line Triple-Track Railway tunnel into a High-Speed Railway lines? The Third Euro tunnel Triple-Track Railway line to make it 11 times better for passengers so they could go from A to B. Then put the modernised 11 carriages per unit A Stock and put them on a bigger modernised Waterloo and city line Triple-Track train tunnel so it could go to bank station to those Five countries such as Australia, Germany, Italy, Poland And Sweden. The modernised refurbished 11 carriages per unit A stock could be a High Speed The Third Triple-Track Euro Tunnel Train So it is promising and 47 times a lot more possible to do this kind of project if that will be OK for London Australia, Germany, Italy, Poland And Sweden. oh by the way, could they also tunnel the Triple-Track Railway Line so it will stop from Buckinghamshire, Hertfordshire and Essex so that the Passengers will go to Australia, Germany, Italy, Poland and Sweden and also extend the Triple-Track Railway Line from the Bank to Buckinghamshire, Hertfordshire and Essex Stations so that more people from there could go to Australia, Germany, Italy, Poland And Sweden more Easily. Why couldn't they extend the Piccadilly Line and also build brand-new underground train stations so it could go even further right up to Clapton, Wood Street can they also make another brand new underground train station in Chingford and could they extend the Piccadilly Line and the DLR right up to Chingford? All of the classes 150, 155, 154, 117, 114, 105, and 106, will be replaced by all of the Scania N112, Leyland 510, Gardner 6LXC, Cummins M11, Volvo B10M, Gardner 6LXB, Gardner LG1200 and Gardner 8LXB Diesel Five carriages three disabled toilets are air conditioning trains including Highams Park for extended roots which is the Piccadilly line and the DLR trains. Could you also convert all of the 1973 stock trains into an air-conditioned maximum speed 78 km/hours (48 MPH) re-refurbished and make it into a 8 cars per unit if that will be alright, and also extend all of the Piccadilly train stations to make more space for all of the extended 8 car per unit 1973 stock air condition trains and can you also build another Mayflower and Tornado Steam Locomotive Companies and can they order Every 87 Octagon and Every 48 Hexagon shape LNER diagram unique small no.13 and unique small no.11 Boilers from those Countries such as Greece, Italy, Poland, and Sweden, can they make Mayflower and Tornado Steam Locomotive speeds by up to 147MPH so you can try and test it on the Original Mainline so it will be much more safer for the Passengers to enjoy the 147MPH speed Limit only for HS2 and Channel Tunnel mainline services, if they needed 16 Carriages Per units, can they use those class 55’s, class 44’s, class 40’s and class 43HST Diesel Locomotive’s right at the Back of those 18 Carriages Per Units so they can take over at the Back to let those Mayflower and Tornado Steam Locomotive’s have a rest for those interesting Journeys Please!!!!, oh can you make all of those 18 Tonne Boxes of Coal for all of those 147MPH Mayflower and Tornado Steam Locomotive’s so the Companies will Understand us PASSENGER’S!!!! So please make sure that the Builders can do as they are told!!!!!!!! And PLEASE do something about these very very important Professional ideas Please? Prime Minister of England, Prime Minister of Australia, Prime Minister of Sweden, Prime Minister of Germany, Prime Minister of Italy, Prime Minister of Poland and that Includes the Mayor of London.

  • @nm28j
    @nm28j Месяц назад

    👍solid vid

    • @sq92032ntd
      @sq92032ntd Месяц назад

      @@nm28j cheers brudda

  • @MatStuff
    @MatStuff 10 месяцев назад

    I pray on the class 171 downfall

  • @Black5Boy
    @Black5Boy Год назад

    Is from today? (24/10/23)

  • @ThePennineWanderer
    @ThePennineWanderer Год назад

    woah squidger posted

  • @Trainspotting_Media
    @Trainspotting_Media Год назад

    Great Clips

  • @Imran_Jameel
    @Imran_Jameel Год назад

    nicely done mate

  • @that_british_trainspotter0001

    nice

  • @theukrailwayguy
    @theukrailwayguy Год назад

    Nice Video!

  • @worothej
    @worothej Год назад

    Lore

  • @londonbuses4646
    @londonbuses4646 Год назад

    Very nice video Squidge! Looking forward to other videos being uploaded soon! You got a new subscriber. 😀