Longburn Freezing works by Ward Demolition
Longburn Freezing Works was constructed in 1890 with additions added up until it’s closure in 1987.
The 20,000 square metre site suffered serious decay, partial demolition and salvage theft, over its 30 years of abandonment before Ward Demolition was engaged for the clearing of the site. Constructed during the thick of the Asbestos Era the structures were severely contaminated, with over 800 tonnes of friable and non-friable materials present throughout.
Another key challenge was the 44-metre-high concrete tower that required demolishing within 5 metres of a live kiwirail train track. Due to the size and complexity of the Job we required a collaborative approach between our Auckland based...
Просмотров: 2 072

Видео

Demolition of Alexandra Parks Epsom Grandstand by Ward Demolition
Просмотров 2 тыс.3 месяца назад
Behind the scenes of the Demolition of the Epsom Grandstand at Alexandra Park in Auckland New Zealand. Featuring a tricky seperation, cut and crane of 100 year old trusses and high reach Demolition. The team managed to pull it off with no loss time injuries, in time on budget and with an impressive 99% recycling rate.
The take down of Southdown Powerstation - Stage 2 Demolition
Просмотров 1,6 тыс.3 месяца назад
Ward Demolition brings you behind the scenes for the second stage of Demolition at Southdown Powerstation. Bayleigh Ward and Jyoti Jain, talk us through the key challenges our team overcome across the 2 year long project. Featuring large scale recycling, high reach demolition, crane lifts and Trucks and heavy machinery. Music by Yurii Semchyshyn from Pixabay
Te Reinga Bridge Demolition 2023
Просмотров 2 тыс.Год назад
Congratulations to the amazing Team involved in the planning and execution of the successful deconstruction of the Te Reinga Bridge located just out of Wairoa in the Hawkes Bay. 🥳 The bridge was catastrophically damaged during cyclone Gabriel. The raging waters full of debris took out the middle pier leaving the bridge with an unstable sag. 🚧 The safest option was to drop the bridge with variou...
We Salvaged a Super Yacht
Просмотров 131 тыс.Год назад
Ward Demolition Salvaged a half built Super Yacht on the Demolition job, Sensation Yachts in 2017 and sold it in 2018. 5 years later we were brought back in to assist with the launch and clean up as it ventures to Australia for the final fit out. This may just be the greatest Demolition Salvage of all time. #superyacht #documentary #boat #demolition #excavator
Ward Demolition Shortlisted in 2022 World Demolition Awards in Environmental and Recycling Category
Просмотров 707Год назад
Ward Demolition Shortlisted in 2022 World Demolition Awards in Environmental and Recycling Category
Ward Demolition Project Shortlisted for 2022 World Demolition Recycling Award
Просмотров 5172 года назад
Ward Demolition are honoured to be shortlisted for 3 of our Projects in this years World Demolition Awards. This St Johns Harrison Road project is one of two of Ward Demo's projects shortlisted in the Recycling category, out of the four projects total shortlisted. Featuring a 93% recycle rate 7% of which was waste materials salvaged for reuse, diverting half the structures rubbish pile from lan...
Imperial Tobacco Part 1 and 2 Combined
Просмотров 1,5 тыс.2 года назад
Imperial Tobacco consisted of 7 buildings demolished across a 44,000 square metre site, under a 6 month time frame. 100% of the structure's concrete was crushed onsite and recycled back into the foundations of the new development. A further 5,679 tonnes of concrete was trucked in from other job sites. Meaning 108% of the site’s concrete was recycled with a total of 26,272 tonnes crushed onsite....
The fall of Albert Streets "Pigeon Palace" by Ward Demolition
Просмотров 7 тыс.2 года назад
The fall of “Pigeon Palace” 2021-2022 Ward Demolition’s deconstruction of Albert St’s, pigeon infested, street kid decorated, CBD Auckland, block of buildings was no simple feat. The tallest crumbly high-rise gave us a horrific surprise while pulling in a 7-story high street facing section. We discovered there was absolutely no rebar in the columns. As we stepped down each side of the building,...
Ward Demolition's Mercury Southdown Power Station Project
Просмотров 1,7 тыс.2 года назад
The first stage of this Demolition see's the dismantling of the Cooling towers while surrounded by live 11V cables and high voltage switch yards. Two 50 tonne diggers and two 20 tonne diggers were used to expertly destroy the building.
Harrison Road St John
Просмотров 1,4 тыс.3 года назад
Check out another smashing Job by the Auckland Team from Ward Demolition on Harrison Road St John. Given a deadline Richie, Zoran, Hayden and the boys did not crack under pressure. I’ll tell you what did crack though, all the concrete that was crushed to be recycled into the foundations of the site. We always aim for absolute minimum waste and we definitely achieved that on this job. It’s been ...
Ward Demo The Port Wellington 2017
Просмотров 8293 года назад
The Port Wellington in 2017 was a significant job for us with one of the buildings being extremely close to the road, extra safety measures had to be implemented as explained in this video. The building was brought down with careful precision without interrupting the traffic flow of the busy main road.
Ward Demolition Imperial Tobacco Part 2
Просмотров 1,6 тыс.3 года назад
In case you were wondering.. That's how you push a building over... We're back at Imperial Tobacco in Wellington as Dalton, Fridae, Ron and the Team push over the tower and a building. The precision in which these feats are taken out is incredible.Both structures are brought to the ground in a very safe and controlled manor. With both buildings destroyed on the same day the site is a whole mont...
Ward Demolition 2020 Kenworth T909 - MR WARD
Просмотров 55 тыс.3 года назад
Shane talks us through the process of loading a 50 tonne digger on Ward Demolition's 2020 Kenworth T909. Check out MR WARD in action as it rumbles through Ward Quarry on a mission. Please note some footage is sped up for the purpose of this video. Machines/ operations are much slower in real time in the interest of safety. For business inquires see our website: www.ward-demolition.co.nz or cont...
Wainuiomata Shopping Centre Countdown Wellington Ward Demolition
Просмотров 3,1 тыс.3 года назад
Episode 2 and Stage two of the Wainuiomata Shopping centre in Wellington. Dalton Ward shows us how to manage high amounts of scrap metal safely in big 50 tonne digger. Our two giant shears can be seen chopping steal like butter. As Atta, one of our two female, Wellington based Labourers, spikes with a positive attitude and a solid work ethic. Tim explains how hard work and perseverance pays off...
Imperial Tobacco Wellington NZ Demolition with Ward Demolition
Просмотров 3,5 тыс.3 года назад
Imperial Tobacco Wellington NZ Demolition with Ward Demolition