maran signalling
maran signalling
  • Видео 6
  • Просмотров 388 104
Gosford Points Renewal
Points 88 and 86 at Gosford are renewed (replaced with Siemens M3A) during the config 9 track work possession in June 2017.
A successful commissioning.
Просмотров: 1 156

Видео

Aluminothermic Rail Welding by RailTechAluminothermic Rail Welding by RailTech
Aluminothermic Rail Welding by RailTech
Просмотров 21 тыс.7 лет назад
Aluminothermic Rail Welding demonstrated by RailTech (Australia) at Rail Industry Field Days Event (1-2 March 2017) held in Heavy Plant Stabling Yard, Major Works Division, Transport Sydney Trains, Rawson Street, Clyde.
Train Drivers View on East Hills Line At NightTrain Drivers View on East Hills Line At Night
Train Drivers View on East Hills Line At Night
Просмотров 5 тыс.11 лет назад
What do drivers see on Sydney Metro East Hills Line at night? It is route setting, 4-aspect signalling system. During ARS trigger-points testing (April 2013).
Double Slips in operationDouble Slips in operation
Double Slips in operation
Просмотров 349 тыс.11 лет назад
Diamond crossing and double slips operation at Flemington.
Koolewong Level CrossingKoolewong Level Crossing
Koolewong Level Crossing
Просмотров 7 тыс.11 лет назад
Half-boom level crossing at Koolewong Station, Central Coast, NSW.
Manned Level Crossing, Parramatta Rd, GranvilleManned Level Crossing, Parramatta Rd, Granville
Manned Level Crossing, Parramatta Rd, Granville
Просмотров 5 тыс.11 лет назад
Manned Level Crossing on Parramatta Road, Granville. The road traffic light 50m away from the level crossing is interlocked with the boom-gate. For the better safety level; the boom gate is controlled by the local signaller.

Комментарии

  • @Woodland26
    @Woodland26 2 месяца назад

    The K2 duplication was genius, converting East Hill line from a very quiet line into a major corridor to the Campbelltown and beyond, which used to go via Granville.

  • @RedArrow73
    @RedArrow73 4 месяца назад

    So does the Exothermic Thermite reaction remove the rust from the rails?

  • @MultiVlogs837
    @MultiVlogs837 11 месяцев назад

    Where are you from?

  • @deffw15hnz3
    @deffw15hnz3 Год назад

    GET THE PHARK OFF THE SLEEPERS YOU KEINT 😡🤬🤬😠😡😤

  • @ianburnett7333
    @ianburnett7333 Год назад

    The most stupid thing to do is replace HW point machines with clamp locks.

  • @davidvalentinmunguiavelez9814

    Que desmadre.

  • @wkl1999143
    @wkl1999143 Год назад

    we may use small sand mold🤔. less iron oxide and aluminum🤔

  • @mancast-bx6hi
    @mancast-bx6hi 2 года назад

    The best train track ever made.

  • @moroteseoinage
    @moroteseoinage 2 года назад

    How do you pour thermite if you're upside down, Australia?

  • @mpeterll
    @mpeterll 3 года назад

    Very interesting. Thanks for posting.

    • @metrahan
      @metrahan 2 года назад

      Hello dears, I am an employee of Iran Railways. I have recently created a channel about Iran's railways, which was also registered in the UNESCO organization 2 years ago. I share videos on the channel about the beauty and very interesting and special points that exist in Iran's railways. I would be very grateful if you visit my channel and support me.🌹🥀💙❤

  • @sergeydilendik6469
    @sergeydilendik6469 3 года назад

    Is it QP process?

  • @charleslloyd5488
    @charleslloyd5488 3 года назад

    Railtech is leader in Rail Welding ..

  • @clems6989
    @clems6989 3 года назад

    My son, was "RV" Ryan with Railtec in the US. ....

  • @evimastuti8283
    @evimastuti8283 3 года назад

    Very the dark view.not have lighting for shot ?

  • @haroldalexis4200
    @haroldalexis4200 3 года назад

    At a quick glance I thought it was New York's Long Island Railroad. Anything in Railroading is interesting tracks switching you name it, I have model electric trains.

  • @maxxiss1971
    @maxxiss1971 4 года назад

    english cross

  • @jovantaworthy1364
    @jovantaworthy1364 4 года назад

    Samsungjbbhj

  • @markbass7145
    @markbass7145 4 года назад

    I forgot I was watching a model for a second.

    • @Trotters79
      @Trotters79 2 месяца назад

      Perhaps because this isn't a model? If you zoom in on the rails, you can see both the bolts fixing the fishplates to the sleepers, and you can also see the pandrols fixing the tracks to the fishplates. This would have to be a model in a very big scale for it to contain that level of detail - It's almost like it's in a 1:1 scale. 😉

    • @markbass7145
      @markbass7145 2 месяца назад

      ​@@Trotters79I don't remember why I made that comment 4 years ago...

  • @amberlywhite9462
    @amberlywhite9462 4 года назад

    nice video that alarm sounds really sick poor thing

  • @OvercookedSteak
    @OvercookedSteak 4 года назад

    at the start, the way that the gate is sort of like split and then joins up reminds me of a type of dutch crossing

    • @yeolunius4559
      @yeolunius4559 Год назад

      If you are talking about the gate shape well then you might be talking about the ‘wishbone gate’ a type of formation for crossing gates that isn’t used a lot today.

  • @trueaussie3097
    @trueaussie3097 5 лет назад

    Get off the sleeper mate far out, just lines the weld up and probably fucked it

  • @3rdrockfromthesun23
    @3rdrockfromthesun23 5 лет назад

    Good demo Tony.

  • @harshrajsingh8080
    @harshrajsingh8080 5 лет назад

    Sir job chahiye

  • @treypohe4593
    @treypohe4593 6 лет назад

    Yay! That's in Sydney!

  • @bengherasim2560
    @bengherasim2560 6 лет назад

    Nice work Tony...time to show some Australian made components

  • @sinisabulovan6812
    @sinisabulovan6812 6 лет назад

    First rule,don’t stand on the slipper.mateeeee

    • @trueaussie3097
      @trueaussie3097 5 лет назад

      SINIŠA BULOVAN pisses me off when my offsides does this right after I line it up

  • @scottleft3672
    @scottleft3672 6 лет назад

    MAAAAATE....we cant be beaten....lol.

  • @shishirislam7562
    @shishirislam7562 7 лет назад

    Nice

  • @STUAA2024
    @STUAA2024 7 лет назад

    That alarm is glitching!

  • @50bottlesofoile36
    @50bottlesofoile36 7 лет назад

    tri samaj me nahi aayega

  • @haroldreardon8070
    @haroldreardon8070 7 лет назад

    timstow thinks its not interesting because he cannot understand anything that is going on here. Not to worry, a lot of people have very little comprehension of mechanical items. That's why so many work in the fast food industry.

  • @PositionLight
    @PositionLight 7 лет назад

    Not sure why you think facing point locks are necessary with power operated points. Removing them would make the throw time much quicker. Also US&S makes covers for its pneumatic point machines. ruclips.net/video/g4-_E6m_gPg/видео.html

  • @therighthonourabletimothy5448
    @therighthonourabletimothy5448 7 лет назад

    About as interesting as watching paint dry!

  • @rwboa22
    @rwboa22 7 лет назад

    That is nothing; you should see the interlocking in North Philadelphia (near N. Broad & Lehigh near the old Connie Mack Stadium) where the 2-track Manayunk-Norristown Regional Rail Line (the former Reading R.R. Main Line) joins together with the 4-track SEPTA Main Line (former Reading R.R. Bethlehem Line), with trains coming from either Center City (30th Street, Suburban/Penn Center, and Jefferson/Market East Stations) and Chestnut Hill, Doylestown, Trenton, Fox Chase, and Norristown changing tracks or merging/diverging to either bypass or stop at North Philadelphia (ex-Reading) station.

  • @alangloverbsa
    @alangloverbsa 7 лет назад

    C k'

  • @CombraStudios
    @CombraStudios 7 лет назад

    it's satisfying

  • @川合誠-z1c
    @川合誠-z1c 8 лет назад

    これシドニー(Sydney)のシティーレール(City rail)かい!

  • @maransignalling207
    @maransignalling207 8 лет назад

    The train is a four-car set, i.e. approximately (20m x 4) 80m. The platform on the down line is short, only 40m accommodating only two rear carriages, passenger get in and out from the those two carriages in the rear. The first two front carriages are hanging out at the crossing with the doors closed.

  • @MrBnsftrain
    @MrBnsftrain 8 лет назад

    1:00 why did the train stop on the loud crossing?

    • @Coastal603
      @Coastal603 6 лет назад

      MrBnsftrain because the station was probably not long enough for the 8 carriage Oscar train so one part of the train reaches the station and this part can’t

  • @albertopineda320
    @albertopineda320 8 лет назад

  • @JLJ061
    @JLJ061 8 лет назад

    Here in the USA most of our double slips also have movable point frogs for a smoother ride.

    • @mytfy1
      @mytfy1 8 лет назад

      +SparkDalmatian Agreed. Far less maintenance as well.

    • @chingchungchang3533
      @chingchungchang3533 7 лет назад

      SparkDalmatian THERE'S three TRACKS involved in that configuration right 🚂🚆🚉🚞🚄🚅🚈🚇🚝🚋🚃🚎🚌

    • @pingpongpung
      @pingpongpung 7 лет назад

      You're sooooo fucking superior, aren't you?

    • @mytfy1
      @mytfy1 7 лет назад

      pingpongpung I am beyond superior. I see all and I know all. I have infinite wisdom.

    • @sylviaelse5086
      @sylviaelse5086 7 лет назад

      In Australia, we're just pleased that there's a line, and that trains come along it. We don't expect trains to be either comfortable, or quick.