SoilWicks
SoilWicks
  • Видео 6
  • Просмотров 107 801

Видео

SoilWicks Prefabricated Vertical Wick Drains Installation 3D
Просмотров 82 тыс.9 лет назад
SoilWicks is a ground improvement contractor specialising in prefabricated vertical drains for the acceleration of subsoil settlement and compaction. We created this high end 3D animation to show, in detail, how prefabricated wick drains work. What happens once the anchor plate is pushed into the ground and some of the technology detailed Soilwicks has put in place to ensure all installation de...
SoilWicks Prefabricated Vertical Wick Drain Installation Rig Technology
Просмотров 3 тыс.9 лет назад
SoilWicks is a ground improvement contractor specialising in prefabricated vertical drains for the acceleration of subsoil settlement and compaction.
SoilWicks Prefabricated Vertical Wick Drains How They Work
Просмотров 5 тыс.9 лет назад
SoilWicks is a ground improvement contractor specialising in prefabricated vertical drains for the acceleration of subsoil settlement and compaction.
SoilWicks Australia's Leading Prefabricated Vertical Wick Drains Installation Company
Просмотров 15 тыс.9 лет назад
SoilWicks is a ground improvement contractor specialising in prefabricated vertical drains for the acceleration of subsoil settlement and compaction.
Brisbane Airport New Parallel Runway Project (NPR) - Australia's largest vertical wick drain project
Просмотров 2,7 тыс.9 лет назад
Brisbane Airport New Parallel Runway Project 2014. SoilWicks is a ground improvement contractor specialising in prefabricated vertical drains for the acceleration of subsoil settlement and compaction.

Комментарии

  • @rachmatmaulanafirmansyah2602
    @rachmatmaulanafirmansyah2602 7 месяцев назад

    Kerja bagus

  • @arghaymillanao8085
    @arghaymillanao8085 10 месяцев назад

    Graciasss!!

  • @alexalekos
    @alexalekos Год назад

    came here from practical engineering's vid to explore this odd method

  • @Adam_mohammed_
    @Adam_mohammed_ Год назад

    Wooow

  • @RONNIN667
    @RONNIN667 Год назад

    hi all i have invented a built in achnor system in the mandrel , so you dont have to waste about 50 Cent in each point . if you are intereted please dont hesitate to contact me

  • @aakashkhanal431
    @aakashkhanal431 Год назад

    soy de Nepal. vídeo muy informativo. perfecto. super. muchas gracias

  • @abizarrin3427
    @abizarrin3427 2 года назад

    thank you, this vid is very helpful

  • @bolonheavyequipment9322
    @bolonheavyequipment9322 2 года назад

    What machine for 60 meters depth?

  • @hansdete
    @hansdete 3 года назад

    Congratulations for the companie's growth! According to the drilling machine, what is the minimum strength required for the subgrade? I mean, the strength that leads to the usage of working platform.

  • @peppefallara872
    @peppefallara872 6 лет назад

    so simple, so clear, so good!

  • @cji1369
    @cji1369 6 лет назад

    I have installed 1800 wicks in 8 hour shift

  • @AnandSp77
    @AnandSp77 8 лет назад

    superb explanation...

  • @marcopolo3001
    @marcopolo3001 9 лет назад

    Go you good thing!