Smart Educare
Smart Educare
  • Видео 237
  • Просмотров 469 523
ETAP Load Modelling II Lumped Load & Static Load for Load Flow Study
Lumped Load & Static Load modelling need to be done properly in ETAP before simulating the load flow study.
Join this channel to get access to perks:
ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin
ETAP Load Flow Study analysis is done in power system network to check and analyze the active & reactive power flow, bus voltage profile, power factor at different buses etc.
ETAP Load Flow Analysis & Load Analyzer
Load Flow Analysis Using ETAP
How to run a Load Flow Study - Example 2, Part 1
How to perform a Load Flow Calculation with ETAP Software
etap load flow analysis
etap load flow analysis pdf
etap load flow analysis example
load flow analysis using etap
unbalanced load flow analysis etap
purpose of...
Просмотров: 746

Видео

ETAP Load Flow II Power Factor Improvement in Power System II Low Tarif by Utility
Просмотров 5413 месяца назад
Power factor can be improved by adding power factor correction capacitors to the power system network. Analysis is done using ETAP software with different case studies. Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin
Harmonic Filter Sizing using ETAP II Harmonic Analysis
Просмотров 1 тыс.4 месяца назад
Harmonic Analysis is performed to check the Power Quality considering the harmonic contribution at PCC (Point of Common Coupling) by non-linear sources such as VFD, Battery & Charger, UPS etc. Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin Voltage Harmonic and Current Harmonic need to be checked whether these are within the acceptable limits as specif...
Harmonic Analysis using ETAP - IEEE519 (Part-2)
Просмотров 4435 месяцев назад
Harmonic Analysis is performed to check the Power Quality considering the harmonic contribution at PCC (Point of Common Coupling) by non-linear sources such as VFD, Battery & Charger, UPS etc. Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin Voltage Harmonic and Current Harmonic need to be checked whether these are within the acceptable limits as specif...
Harmonic Analysis using ETAP - IEEE519 (Part-1)
Просмотров 8585 месяцев назад
Harmonic Analysis is performed to check the Power Quality considering the harmonic contribution at PCC (Point of Common Coupling) by non-linear sources such as VFD, Battery & Charger, UPS etc. Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin Voltage Harmonic and Current Harmonic need to be checked whether these are within the acceptable limits as specif...
ETAP Short Circuit Study II Device Duty & 3 Phase Fault Analysis
Просмотров 1,3 тыс.6 месяцев назад
Short Circuit Device Duty is performed to choose the selectivity of power system equipment. IEC 60909 is used to perform 3-phase fault, L-G, L-L, L-L-G faults. In this video, the purpose and difference between Device Duty and IEC 60909 faults are explained with the help of ETAP simulation software. Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin Short ...
ETAP Load Flow Analysis II How to Apply Load Diversity Factor
Просмотров 1,4 тыс.6 месяцев назад
Load Diversity Factor needs to be applied depending on the actual absorbed load in power system network. If the rated connected loads are used to simulate Load Flow study, the actual figure of the load flow or voltage profile or equipment loading such as transformer, cable etc. can not be determined accurately. There are different ways to assign the Load Diversity Factor in ETAP. Loading catego...
IDMT Relay Settings Calculation in ETAP using IEC Formula | Relay trip co ordination
Просмотров 1,3 тыс.6 месяцев назад
IEC Curves || Normal Inverse (NI) || Very Inverse (VI) || Extremely Inverse (EI) || Long Time Inverse (LTI) IDMT characteristic of protection relay can be used for electrical protection system. IDMT (Inverse Definite Minimum Time) relay characteristic came into the picture in power system protection engineering when only Time grading or Current grading for relay protection co-ordination is not ...
Electrical Conduit Installation II Conduit Embedment कैसे बनाएं ??
Просмотров 2147 месяцев назад
Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin #conduit #embedding #conduite
PD Sequence of Operation in ETAP II Phase & Ground Fault Analysis
Просмотров 7058 месяцев назад
IDMT characteristic of protection relay can be used for electrical protection system. IDMT (Inverse Definite Minimum Time) relay characteristic came into the picture in power system protection engineering when only Time grading or Current grading for relay protection co-ordination is not enough. Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin This vide...
Cable Sizing Calculation II Manual Calculation in MS Excel
Просмотров 1,8 тыс.8 месяцев назад
Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin Cable Sizing Calculation criteria are current carrying capacity, voltage drop & short circuit. Cable Sizing Calculation can be performed using ETAP software. Cable sizing calculation| How to select cable size| Electrical Technology and Industrial Practice How to select cable size? AC cable size & Voltage ...
Cable Sizing Calculation in Excel Spreadsheet
Просмотров 3 тыс.8 месяцев назад
Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin Cable Sizing Calculation criteria are current carrying capacity, voltage drop & short circuit. Cable Sizing Calculation can be performed using Excel spreadsheet. Cable sizing calculation| How to select cable size| Electrical Technology and Industrial Practice How to select cable size? AC cable size & Volt...
Capacitor Bank Sizing Calculation for Power Factor Improvement
Просмотров 8658 месяцев назад
Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin To improve the system power factor in power system network, capacitor can be used. Analysis is done using ETAP software with different case studies. Power factor can be improved by adding power factor correction capacitors to the power system network.
Capitalization Cost Calculation of Transformer Losses
Просмотров 3878 месяцев назад
Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin Capitalization Cost Calculation of Transformer Losses transformer impedance transformer impedance calculator typical transformer impedance ieee transformer impedance table three winding transformer impedance transformer impedance formula transformer impedance matching transformer impedance ratio iec trans...
Transformer Rating Selection explained in Excel Spreadsheet
Просмотров 8268 месяцев назад
Join this channel to get access to perks: ruclips.net/channel/UC9rzhirCF3CxM7eBEfppALAjoin transformer impedance transformer impedance calculator typical transformer impedance ieee transformer impedance table three winding transformer impedance transformer impedance formula transformer impedance matching transformer impedance ratio iec transformer impedance transformer impedance table transform...
Earth Grid Mat Design Calculation in Excel Spreadsheet II Practical Example
Просмотров 6738 месяцев назад
Earth Grid Mat Design Calculation in Excel Spreadsheet II Practical Example
How to plot SC MAX MIN in TCC Curve using ETAP II Relay Protection Coordination
Просмотров 9 тыс.9 месяцев назад
How to plot SC MAX MIN in TCC Curve using ETAP II Relay Protection Coordination
Cable Tray Routing Layout II Explained with Practical Example
Просмотров 1,6 тыс.9 месяцев назад
Cable Tray Routing Layout II Explained with Practical Example
Signal Communication with Remote DCS / PLC II How does DI / DO work?
Просмотров 2559 месяцев назад
Signal Communication with Remote DCS / PLC II How does DI / DO work?
How to restore Default Data of Components in ETAP Model
Просмотров 4619 месяцев назад
How to restore Default Data of Components in ETAP Model
How to model Transformer ONAN & ONAF Rating Impedance in ETAP
Просмотров 7179 месяцев назад
How to model Transformer ONAN & ONAF Rating Impedance in ETAP
Cable Size Selection in Power System I Cable Sizing Calculation I Short Circuit Criteria
Просмотров 1,2 тыс.9 месяцев назад
Cable Size Selection in Power System I Cable Sizing Calculation I Short Circuit Criteria
ETAP Common Error during Motor Starting II Power System Analysis
Просмотров 7149 месяцев назад
ETAP Common Error during Motor Starting II Power System Analysis
Transformer Grounding and Vector Group using ETAP
Просмотров 7809 месяцев назад
Transformer Grounding and Vector Group using ETAP
Protection Coordination II Protection Stages in IDMT Relay
Просмотров 5729 месяцев назад
Protection Coordination II Protection Stages in IDMT Relay
Fault Contribution by Motor to Power System Network analysis using ETAP
Просмотров 89510 месяцев назад
Fault Contribution by Motor to Power System Network analysis using ETAP
ETAP System Study II How to Model High Voltage Circuit Breaker in ETAP
Просмотров 1,5 тыс.10 месяцев назад
ETAP System Study II How to Model High Voltage Circuit Breaker in ETAP
ETAP System Study II How to Model LV Molded Case Circuit Breaker
Просмотров 79310 месяцев назад
ETAP System Study II How to Model LV Molded Case Circuit Breaker
Impact of Power Factor in Power System Network using ETAP
Просмотров 37010 месяцев назад
Impact of Power Factor in Power System Network using ETAP
ETAP Power System Study II Single Line to Ground Fault Analysis
Просмотров 1,6 тыс.10 месяцев назад
ETAP Power System Study II Single Line to Ground Fault Analysis

Комментарии

  • @jenmatt6699
    @jenmatt6699 День назад

    Email id pls

  • @GrowSelf-i7y
    @GrowSelf-i7y 3 дня назад

    You are Gem

  • @biniyamabiy7750
    @biniyamabiy7750 6 дней назад

    How can we get excel

  • @Anaskamal234-r4s
    @Anaskamal234-r4s 7 дней назад

    is their anyone who can help me out for the installation of etap

  • @debanjanacharya
    @debanjanacharya 10 дней назад

    sir can you please post the link of the video where you have detailed the concept of trip device in low voltage circuit breaker?

  • @sushantakumarsenapati4967
    @sushantakumarsenapati4967 11 дней назад

    Sir, i sent mail query. Please reply

    • @sushantakumarsenapati4967
      @sushantakumarsenapati4967 11 дней назад

      Doubt: 275kV substation: 40kA, 33kV: zigzag transformer earthing of 400A fault limit, LV system: 65kA (TNS system)

    • @sushantakumarsenapati4967
      @sushantakumarsenapati4967 11 дней назад

      What will be the fault current to be considered for ground grid conductor sizing?

  • @kaisalvi7850
    @kaisalvi7850 17 дней назад

    This channel is very extraordinary in explaining, good content also for someone who is still a beginner. he kindly also shared the entire file on this video. hopefully fast growing and successful your youtube channel. PLZ make more useful video and manual calculation (ETAP) SOFTWARE THANKS

  • @beckenbauer1974
    @beckenbauer1974 18 дней назад

    Is there any way to simulate Transient voltage recovery after Generator fault clearance?

  • @sahilbhagat4356
    @sahilbhagat4356 19 дней назад

    Lighting loads or sockets which may or may not be connected to motor shall be considered as static load?

  • @kaisalvi7850
    @kaisalvi7850 20 дней назад

    very nice explained with perfect calculation plz make more etap videos with your projects and also share all excel sheets

  • @ehabshabaan7866
    @ehabshabaan7866 26 дней назад

    Hi , what about the min. gap conductors/phases. And min gap conductors (L-G). Please clarify how we can get the above info

  • @Whitetooth1030
    @Whitetooth1030 Месяц назад

    Kind of pointless video. Why not explain the reasons for selecting the values you did ? You didn’t explain the pickup range values, curve type, or how to coordinate with existing data.

  • @SXF-ri6rk
    @SXF-ri6rk Месяц назад

    Your english is so frightened that I can hear nothing。。。。。。。。。。。

  • @g.r.akashprbhagar9927
    @g.r.akashprbhagar9927 Месяц назад

    Sir is there any possibilities to run 2 synchronous generators in parallel and connect it to a common bus ?

  • @tanveerulhaq124
    @tanveerulhaq124 Месяц назад

    Sir Transformer impedance changes with tape position , how to adjust that in etap?

  • @aminhsin855
    @aminhsin855 Месяц назад

    What fuckn you eating while talking, i lose my temper

  • @MNawfal06
    @MNawfal06 Месяц назад

    I tried this in my system but when i give fault in bus 4 , relay 3 works first hence cb3 opens then cb4 then cb1 and cb2 Can u tell me where i might have went wrong i did the same as urs

  • @JoakimD1
    @JoakimD1 Месяц назад

    are you litterly eating an lollipop while talking ? or what the fuck you sucking on?

  • @INTROVERT_GIRL-n7p
    @INTROVERT_GIRL-n7p Месяц назад

    Can you send the simulation of this circuit or can you tell where is the video of this simulation because i have to make it for my lab but clearly not understand what components you have used?

  • @abdelmalek9682
    @abdelmalek9682 Месяц назад

    THANKS MAN! DO YOU HAVE DONE ANY VIDEOS ABOUT HOW TO GREAT DIFFERENT SCENARIO IOS OF THE SAM DIAGRAM ?

  • @GATTSXX
    @GATTSXX Месяц назад

    Its must to but pro version of dailux evo to get these features?

  • @bashiryusuf5215
    @bashiryusuf5215 Месяц назад

    please am a beginner in dialux evo , Calculation problem Greetings, Awhen I press calculation, nothing happens. I can see the progress bars but there's no progress. I've waited for a few hours and still nothing. When I press cancel the calculation, I get "not responding" error and have to force it to close the program. I've tried to close and restart my computer multiple times, tried to do the calculations with my old work, also tried to reinstall dialux and made sure that the computer is updated correctly, but nothing seems to be working.

  • @khairullatif6890
    @khairullatif6890 Месяц назад

    Hi sir. How to input leading power factor value at generator sincron on etap. Thanks

  • @ScottMcQuaide-i7n
    @ScottMcQuaide-i7n Месяц назад

    Thank you, Could I get a copy of the spreadsheet.

  • @MrOptimusPrime.
    @MrOptimusPrime. Месяц назад

    Just dont click everywhere randomly and trash talk. Just give an introduction initially what is the aim and what are you upto... After 3:50 minutes complete trash talk and ahhmmm ahhhmmm and random clicks.

  • @ScottMcQuaide-i7n
    @ScottMcQuaide-i7n Месяц назад

    I love you. Thank you so much!

  • @MUHAMMETSALİHTOK
    @MUHAMMETSALİHTOK Месяц назад

    Good day sir, I have a question. For example, how can I write a 34.5/0.4 +_12%1.25 transformer into the program? That is, where should I write the +-12% 1.25 values? And where should I write the losses?

  • @jobsebastian94
    @jobsebastian94 Месяц назад

    Hi Sir, what could be the reason if the "FCT not determined" error still showing against ACB even when the trip device is selected? Please support, Thanks.

  • @Loki-vp4in
    @Loki-vp4in Месяц назад

    When I place a fault on any of the downstream busses, it opens the HV CB. It should technically? Thanks.

  • @abdelmalek9682
    @abdelmalek9682 Месяц назад

    why did you set the secondary pickup to 170 amps ?? i don't get it ?

    • @SmartEducare
      @SmartEducare Месяц назад

      Earth fault setting is recommended 10-30% of CT rated current

  • @samandlettie3721
    @samandlettie3721 Месяц назад

    Ive just worked the calculation for volt drop at 1.777 and not 4 any ideas what ive done wrong could you show the calculation format in the cell

  • @danielocampo725
    @danielocampo725 Месяц назад

    Hi, Thanks a lot for the info, Greetings from Colombia.

  • @charlesbenwari2327
    @charlesbenwari2327 2 месяца назад

    Please can you share the excel sheet. thanks

  • @manni02
    @manni02 2 месяца назад

    Sir, usually for earth mat design we consider soil resistivity data at depth or spacing of 10meter for determining soil model. What should be the depth or spacing at which resistivity data should be considered please guide and also tell if there are any references in IEEE, for the same. Thanks

  • @ignaciovasquez1601
    @ignaciovasquez1601 2 месяца назад

    Is there any way to clip the current and see more than that current in the curve? I'd like to see the entire curve and the SC levels in one plot without having to add manually the current levels

  • @hanial-shadadi9122
    @hanial-shadadi9122 2 месяца назад

    Why don't discuss the dump load model editor..

  • @Kanmanis_official
    @Kanmanis_official 2 месяца назад

    Please make one video related to support for the Tray routing and Control room cable tray routing? Expect positive reply

  • @Kanmanis_official
    @Kanmanis_official 2 месяца назад

    This question for both electrical and Instrumentation team

  • @Kanmanis_official
    @Kanmanis_official 2 месяца назад

    Hi sir, thanks for the valuable video, Should we give a separate Cutout or Wall opening details layout to the Civil team?, or else after we model they take it from Navis.

  • @தமிழ்விடுதூது
    @தமிழ்விடுதூது 2 месяца назад

    How to calculate the fux level for particular room

  • @muhammadmusa8642
    @muhammadmusa8642 2 месяца назад

    Why iam always error

  • @ledepart.design
    @ledepart.design 2 месяца назад

    Wonderful job my man!

  • @timothymcglynn1935
    @timothymcglynn1935 2 месяца назад

    Thanks 👍

  • @shubhamnaik7139
    @shubhamnaik7139 2 месяца назад

    I have doubt in following points ..kindly explain 1. Calculated Vk as per given data is coming 175 V. then why you consider 175 V as Vk/2 and 350V as Vk?? 2. In calculation of stabilizing resistor, Formula given in Vs and you consider vk 175 V in place of Vk??

  • @elkefelixparionarojas7180
    @elkefelixparionarojas7180 2 месяца назад

    AUN CUANDO CAMBIO LA PRECISION A 0.9 NO PUEDE GENERAR LA ESTIMACION MIENTRAS ESTE EN NAMEPLATE, EN TANTO QUE CUANDO LO CAMBIO A USER DEFINED SI HACE LA ESTIMACION

  • @DesignDepartment-m3q
    @DesignDepartment-m3q 2 месяца назад

    could you provide excel sheet??

  • @abdelmalek9682
    @abdelmalek9682 2 месяца назад

    thanks man but! isn't Solid grounding less common in LV systems?? due to the high fault currents it produces, which can lead to equipment damage, arc flash hazards, isn't, resistance grounding or ungrounded systems are often used to limit fault current, enhance safety ??

    • @SmartEducare
      @SmartEducare 2 месяца назад

      Yes, you are right as far as the high earth fault current and arc flash is concerned.. However, considering the fact that earth fault detection is very challenging for NGR or limited earth fault value and ungrounded network at LV level, it is recommended to go for the solidly earth system at LV.. At present, majority of the industrial and commercial installation are following the LV solidly earth system..

    • @abdelmalek9682
      @abdelmalek9682 2 месяца назад

      @@SmartEducare thanks man ❤️