JB Commissioning Tunneling, mining & Quarry
JB Commissioning Tunneling, mining & Quarry
  • Видео 41
  • Просмотров 65 361
Endress Hauser promag 10/50 Change of the K Factor/Coefficient in Expert Mode.
When you change the electronic card in the flowmeter or when you remplace the flowmeter or the transmitter then you have to adjust the coefficient K as it is writted on the flowmeter to make sure it will be accurate again.
1- Go to operation mode
2 - Enter expert code 4685
3- Go to sensor data
4- Adjust calibration date
5- Change K factor, find his value on the flowmeter sticker
6- Double check or adjust the diameter of the flowmeter (DN)
Просмотров: 108

Видео

MS SaveSand Aggregates Recycling Plant in opération in Belgium
Просмотров 187Месяц назад
New SaveSand by MS Recycling Plant ♻️ just started up this month in Belgium 🇧🇪 for Nonet Hublet sprl A full MS turnkey Project, a top engineered recycling solution including our history machine ( Sand production modul, Attrition, Thickner with surface scraper, Filter Press with Build Better, etc..) and for the very first time our newly developped unit the Triforce by MS The triforce receiving a...
Schneider VFD ATV930 - Start motor in local from HMI & Auto-Tuning
Просмотров 3427 месяцев назад
Schneider VFD ATV930 - Start from HMI & Auto-Tunning
MS Filter Press on Melbourne Metro Tunnel Project #stp #tbm #filterpress
Просмотров 14010 месяцев назад
MS Filter Press on Melbourne Metro Tunnel Project #stp #tbm #filterpress #engineering #mining #tunnelling
MS Slurry Treatment Plant on Eole Project ( Paris ) # STP #tunnelling #tbm #engineering #process
Просмотров 112Год назад
MS Slurry Treatment Plant in opération on Eole Project Paris ( RER Line E Expension Project)
KSB Valve mechanical and electrical end switch adjustments
Просмотров 51Год назад
Here is a quick video on how to adjust KSB valve end switch 1- Make sure the valve is closed (if not then force it to close) 2-Remove caps end on both side 3-Tight the set screw until it's hard 4-Force opening of the valve 5- Tight clockwise the set screw about 1 turn (360°) on both side 6- Force closing of the valve 7- Put back and tight the cap 8- Test it. If she still getting difficult to op...
MS Water Treatment Plant on a UK recycling facility #MS #Watertreatmentplant #engineering #process
Просмотров 40Год назад
MS Water Treatment Plant on a UK recycling facility #MS #Watertreatmentplant #engineering #process
MS Slurry Treatment Plant on Thames Tideway Tunnel Project (Chambers Wharf Site) #tunneling #STP
Просмотров 91Год назад
MS Slurry Treatment Plant on Thames Tideway Tunnel Project (Chambers Wharf Site) #tunneling #STP
Endress Hauser Levelflex FMP57 commissioning & setting
Просмотров 1,9 тыс.Год назад
Endress Hauser Levelflex FMP57 commissioning & setting
MS Thickener & Filter Press on UK Aggregates Recycling Facilities
Просмотров 45Год назад
MS Thickener & Filter Press on UK Aggregates Recycling Facilities
MS - Thickener / Clarifier on French Quarry
Просмотров 18Год назад
MS - Thickener / Clarifier on French Quarry
MS Twin Filter Press at Perth Forrestfield Airport Link
Просмотров 49Год назад
MS Twin Filter Press at Perth Forrestfield Airport Link
MS Slurry Treatment Plant on HS2 Project (London side)
Просмотров 203Год назад
MS Slurry Treatment Plant on HS2 Project (London side)
MS Filter Press with robot wash
Просмотров 51Год назад
MS Filter Press with robot wash
MS Micro Cycloning Fine Sand Recovery in Mauritius Island
Просмотров 59Год назад
MS Micro Cycloning Fine Sand Recovery in Mauritius Island
MS - Sand Modul, Attrition, Thickener, Filter Press at Réunion Island
Просмотров 30Год назад
MS - Sand Modul, Attrition, Thickener, Filter Press at Réunion Island
MS - STP ( Slurry Treatment Plant) on Grand Paris Express Line 18 Metro Project
Просмотров 87Год назад
MS - STP ( Slurry Treatment Plant) on Grand Paris Express Line 18 Metro Project
MS - WTP ( Waste water treatment plant for tunneling) at London Power Tunnel
Просмотров 46Год назад
MS - WTP ( Waste water treatment plant for tunneling) at London Power Tunnel