Kingman's equation: effect of utilization or the magnifying effect.
Просмотров 4,8 тыс.6 лет назад
This video describes a part of Kingman's equation related to the utilization of processes. The higher the utilization, the higher the impact of variation, this has as result longer waiting times and high WIP. Rajan Suri calls this "the magnifying effect". This video is part of a series of videos about Kingman's equation.
Planning and Control in HVLV 5: POLCA
Просмотров 1,8 тыс.6 лет назад
This is Part 5 of a series of six parts explaining about Planning and Control in High-Variety/Low-Volume (HVLV) Companies. This video is a short explanation about POLCA. POLCA is a planning and control system which was designed by Rajan Suri, the founder of the Quick Response Manufacturing. It is focused on realizing short throughput times. The POLCA planning and control system assumes the pres...
Planning and Control for HVLV 6: CONWIP-FIFO-TAKT
Просмотров 2 тыс.6 лет назад
This is the last part of a series of six parts explaining about Planning and Control in High-Variety/Low-Volume (HVLV) Companies. This video explain the three principles of The CONWIP/FIFO/TAKT planning and control system. This system was developed at the company Eaton Holec in the Netherlands. It is easy to implement and does not ask a lot of data. First, there is the CONWIP principle. The num...
Utilization
Просмотров 3,1 тыс.6 лет назад
This video describes the basic principles of utilisation. The video belongs to the overall topic of factory physics.
Kingman’s Equation: Influence of Variation
Просмотров 3,9 тыс.6 лет назад
This video presents the effect of Variation in the Kingman's Equation. The Kingman’s Equation provides an approximation of the mean waiting time of the components for a single process based on its utilization and variation. This video will focus on the direct effect on waiting time. Previous video explained the basics of the equation.
Kingman’s Equation: Introduction
Просмотров 8 тыс.6 лет назад
This video presents the basic principles of Kingman's Equation. The Kingman’s Equation provides an approximation of the mean waiting time of the components for a single process based on its utilization and variance This video will introduce the equation. Later videos will expand this formula multiple servers.
Service Blueprint
Просмотров 47 тыс.6 лет назад
This video presents the basic principles of the Service Blueprint. Service Blueprinting is a process mapping tool which is mainly used in service environments. It illustrates an in-depth customer journey applying a user centred perspective.
Swimlane
Просмотров 2,5 тыс.6 лет назад
This video presents the basic principles of a Swimlane (diagram). A Swimlane is a process mapping tool which diagrams a process from start to finish. It distinguishes different process steps that are executed by different actors.
Planning and Control in HVLV 4: JIT and Kanban
Просмотров 4536 лет назад
This is Part 4 of a series of six parts explaining about Planning and Control in High-Variety/Low-Volume (HVLV) Companies. Just in time (JIT) is a Japanese management philosophy which has been applied in practice since the early 1970s in many Japanese manufacturing organizations. It was first developed and perfected within the Toyota manufacturing plants by Taiichi Ohno as a means of meeting co...
Planning and Control in HVLV 3: MRP
Просмотров 3866 лет назад
This is Part 3 of a series of six parts explaining about Planning and Control in High-Variety/Low-Volume (HVLV) Companies. This video will give a short overview of Material Requirements and Resource Planning (MRP). We will present and discuss strong and weak points of the system. MRP creates material plans and production schedules based on the lead times of the supply chain. it makes use of sof...
Planning and Control in HVLV 2: Period Batch Control
Просмотров 6126 лет назад
This is Part 2 of a series of six parts explaining about Planning and Control in High-Variety/Low-Volume (HVLV) Companies. This video will explain the concept of Period Batch Control step by step, the first Just-in-Time system. We will draw major lessons that can be used in modern production planning and control.
Planning and Control in HVLV 1: Methodological History
Просмотров 8546 лет назад
This is Part 1 of a series of six parts explaining about Planning and Control in High-Variety/Low-Volume (HVLV) Companies. This is the introductory video that will give a short overview of important methodological developments in the planning and control at HVLV Companies. We distinguish six important developments: 1. Period Batch Control: fixed lead times = simplified cell coordination 2. Mate...
An Introduction to Card-Based Shop Floor Control
Просмотров 1 тыс.6 лет назад
This video introduces the module on Card-Based control. The module includes methods like Kanban, Cobacabana, Conwip and POLCA. These different methods can be implemented to limit Work-in-Process (WIP) inventory on the shop floor. The key element is to allocate cards to the items.
Kanban Card Example Part 2
Просмотров 2,9 тыс.6 лет назад
This video is Part 2 that further exemplify Kanban done by Ghent University. This video illustrates how to calculate the amount of Kanban cards does the production loop need if there is multiple products on the same machine. Kanban is Card-Based inventory control system that introduces limitations for Work-in-Process (WIP) inventory. It is an effective tool to support running the production sys...
Kanban Card Example Part 1
Просмотров 6 тыс.6 лет назад
Kanban Card Example Part 1
Kanban Overview
Просмотров 2,6 тыс.6 лет назад
Kanban Overview
Layout and Cell Design 4: Flow Dominance Measure Examples
Просмотров 8966 лет назад
Layout and Cell Design 4: Flow Dominance Measure Examples
Layout and Cell Design 3: Quantifying Flow Characteristics
Просмотров 3306 лет назад
Layout and Cell Design 3: Quantifying Flow Characteristics
Layout and Cell Design 2: Layout Planning and Methods
Просмотров 1,1 тыс.6 лет назад
Layout and Cell Design 2: Layout Planning and Methods
Layout and Cell Design 1: Product Family Grouping
Просмотров 1 тыс.6 лет назад
Layout and Cell Design 1: Product Family Grouping
EuroLEAN+ Video Introduction
Просмотров 2116 лет назад
EuroLEAN Video Introduction
Kanban 4: Production Kanban
Просмотров 5 тыс.6 лет назад
Kanban 4: Production Kanban
Kanban 3: Container Kanban
Просмотров 1,4 тыс.6 лет назад
Kanban 3: Container Kanban
Kanban 2: The Basics
Просмотров 3016 лет назад
Kanban 2: The Basics
Kanban 1: What is Kanban?
Просмотров 3216 лет назад
Kanban 1: What is Kanban?
Drum Buffer Rope & Theory of Constraints
Просмотров 40 тыс.6 лет назад
Drum Buffer Rope & Theory of Constraints
Makigami
Просмотров 16 тыс.6 лет назад
Makigami
Cobacabana 2: Estimating Workload Limit for Workstations
Просмотров 5286 лет назад
Cobacabana 2: Estimating Workload Limit for Workstations
VSM 3 - VSM in High-Variation, Low-Volume Production Environment
Просмотров 9 тыс.6 лет назад
VSM 3 - VSM in High-Variation, Low-Volume Production Environment

Комментарии

  • @ShantanuTiwari-t6l
    @ShantanuTiwari-t6l 3 дня назад

    I passed the PE-Industrial exam this week. Thanks to your amazing videos.

  • @sukhvinderattri880
    @sukhvinderattri880 3 месяца назад

    Thanks for such type of good information. I have one question that how we calculate process lead time between two operations

  • @DavidPrendergastIsTheking
    @DavidPrendergastIsTheking 5 месяцев назад

    sixth

  • @Legendofaustria
    @Legendofaustria 6 месяцев назад

    fifth

  • @GreenCrossEye
    @GreenCrossEye 7 месяцев назад

    @ 7:10, the table on the right hand side, the values with 2 servers seem to be wrong. They dont match the output of the sq.rt formula. can you please clarify , what is this number (extreme rigth column)

  • @ArchitBohra
    @ArchitBohra 8 месяцев назад

    fourth

  • @altr0403
    @altr0403 Год назад

    Hi! The U for the multiple servers - what U is that? Are you assuming that all servers have the same utilization, or are you taking the average of their utilization?

  • @beatrizsimoes8915
    @beatrizsimoes8915 Год назад

    In the case of a consumer workstation operates in three shifts and the predecessor, producer workstation operates in one shift, the waiting time should include the two shifts the producer workstation is not operating?

  • @RandSaleh-r2h
    @RandSaleh-r2h Год назад

    Thanks!

  • @dd23313
    @dd23313 Год назад

    Amazing job!!

  • @mackenzieneill4486
    @mackenzieneill4486 Год назад

    third

  • @RafaelSilva-sk1jd
    @RafaelSilva-sk1jd Год назад

    Insightful!

  • @joshclark3439
    @joshclark3439 Год назад

    So much work went into this video, only to be completely wrecked by the narration.

  • @hamzasaad8431
    @hamzasaad8431 Год назад

    You have error in your VSM map, the last value added must be 3 on time line because C/T =3, however when you calculated the total value time is correct 17, this mean you considered 3, not 2 as what was written. Thank you for nice presentation

  • @dimitriskourg
    @dimitriskourg Год назад

    thank you! It was very helpful! thank youuuuu!!

  • @lauravirginiarodriguezgonz5637
    @lauravirginiarodriguezgonz5637 2 года назад

    Excellent explanation

  • @a.h.m.shakilaktar6781
    @a.h.m.shakilaktar6781 2 года назад

    Thank you so much

  • @dixitsarvaiya8030
    @dixitsarvaiya8030 2 года назад

    Gujrati me nahi samja sakte kya ??

  • @gravetwisted797
    @gravetwisted797 2 года назад

    「コンテンツを調整する必要があります」、

  • @RedReyPanda
    @RedReyPanda 2 года назад

    Great video, Thank you !

  • @chuckbenger8918
    @chuckbenger8918 2 года назад

    second

  • @splade18
    @splade18 2 года назад

    Sound mixing is terrible, intro blew my ears off.

  • @dangut702
    @dangut702 2 года назад

    Under support processes, I'd add: "order & delivery or of raw/fresh ingredients": veg/meat/fruit etc...

  • @ulischumacher3515
    @ulischumacher3515 2 года назад

    The book is called The Goal not The Aim.

  • @MalekGegham
    @MalekGegham 3 года назад

    Thank you very much for this video 🙏🏼

  • @kdougall652
    @kdougall652 3 года назад

    Informative video !

  • @Drewidru
    @Drewidru 3 года назад

    You exlain NOTHING. NOTHING UNDERSTUD!

  • @dongeeguy
    @dongeeguy 3 года назад

    Isn't this called Kanban?

  • @gabu937
    @gabu937 3 года назад

    hello, thanks for the help about this method, wish book do you use for the example ?

  • @weixing8306
    @weixing8306 3 года назад

    I like this very much,thank you .

  • @govindmallurwar5647
    @govindmallurwar5647 3 года назад

    What's wrong with you man, why don't you take pauses between sentences. Any way good job. I understood the concept.

  • @smilloww2095
    @smilloww2095 3 года назад

    i smell dutch

  • @avicamhi5311
    @avicamhi5311 3 года назад

    Thank you

  • @michellelisapoot
    @michellelisapoot 3 года назад

    really can't hear what he is saying

  • @goleft4088
    @goleft4088 3 года назад

    4:21 huh?

  • @sheryll9966
    @sheryll9966 3 года назад

    Thanks!

  • @srinivasanbalan2469
    @srinivasanbalan2469 3 года назад

    Hi, thanks for the video. There is a mistake in the denominator of the magnifying effect formula. It is U^((2*(s+1))^0.5-1) / s (1 - U).

    • @poke192
      @poke192 3 года назад

      Exactly, I've noticed it too :)

    • @josephlouisk
      @josephlouisk Год назад

      Super! Thank you!

  • @endlesskurko
    @endlesskurko 3 года назад

    Leaving a comment here so you know that this was really useful.

  • @harshvardhan17
    @harshvardhan17 3 года назад

    Throughput time's unit should be 1/day, not day, as throughput time is defined as inverse of cycle time. Correct me if I'm wrong.

  • @sheevapf
    @sheevapf 3 года назад

    Haha, a waste of time, but I laughed, special thanks to the comments!

  • @varindersingh-hn2df
    @varindersingh-hn2df 4 года назад

    why did you write the cycle time of assembly and inspection as 2 min at the bottom and 3min above? I think its a mistake

  • @didierfelice390
    @didierfelice390 4 года назад

    first

  • @Trunk874
    @Trunk874 4 года назад

    Very good thank you for sharing this. Service blueprints are highly collaborative

  • @espound
    @espound 4 года назад

    It's a minor quibble but the initial example shows a queue and says there is no variability. If there is no variability, there is no queue.

  • @deepaknagar
    @deepaknagar 4 года назад

    Fastest way to become lean = Theory of Constraints. Theory of Constraints is way more than making a company / operations lean. It helps to link and synchronize every part of any systems towards the GOAL of the system.

  • @الوفهالوفه-ج8ق
    @الوفهالوفه-ج8ق 4 года назад

    س3س٣سذءصص٢ شذضذض الله ء٢

  • @maissaazab4946
    @maissaazab4946 4 года назад

    Please change the narration

  • @ghassanadhami8339
    @ghassanadhami8339 4 года назад

    Background music very distracting.

  • @MrChiragvora
    @MrChiragvora 4 года назад

    Change the guy.... Sleep inducing

  • @RobertRaubenheimer
    @RobertRaubenheimer 4 года назад

    Oof.