Foundation backfill complete!
This morning the excavator returned to complete the backfilling around the foundation walls and we had two more truck loads of rock come in to complete the interior fill. My first walk-around inside!
Просмотров: 31

Видео

Fill Baby Fill!
Просмотров 1819 часов назад
Backfilling in process and stone delivery for interior build up and plumbing rough in.
Foundation insulation is finished. Ready for backfill.
Просмотров 2721 час назад
Our house design is perfect for in-floor heating and we are using a hydronic system to heat the concrete floor of the house. This type of heat is dependent on having a good thermal barrier to the earth to retain the system heat. Today the concrete contractor added foam insulation to the interior of the foundation walls. You have to plan for this expense, the foam board they use is very expensiv...
Christmas greetings to all!
Просмотров 1914 дней назад
A short walk on Christmas to go check out the build site!
December 20, 2024
Просмотров 4721 день назад
December 20, 2024
Inspecting foundation after concrete has been poured
Просмотров 3721 день назад
The wall forms are filled and final floor height is set
Forms set for foundation walls
Просмотров 3321 день назад
Details of the form construction in preparation for concrete pour
Concrete delivery
Просмотров 48121 день назад
Concrete delivery
Day 2. Complications with excavation $$
Просмотров 49Месяц назад
This house sits on a 4 foot foundation wall. The footings for the foundation wall can't be set in loose dirt so extra digging is needed.
December 9, 2024
Просмотров 38Месяц назад
December 9, 2024
December 9, 2024
Просмотров 35Месяц назад
December 9, 2024

Комментарии

  • @1sissysue
    @1sissysue 22 дня назад

    That's awesome and looks large. Congratulations again, my good friend.