The Crossing Group
The Crossing Group
  • Видео 18
  • Просмотров 31 831
How the Down The Hole (DTH) Boring System Works - The Tunneling Company
The Tunneling Company’s down the hole (DTH) boring system is the world’s first purpose-built horizontal DTH drilling solution. This robust and cost effective system can tackle challenging soil conditions such as bedrock or boulders and is capable of drilling in a steel pipe with a diameter of between 8” to 48” inches. The addition of this technology further expands the geotechnical conditions that The Tunneling company can efficiently and reliably install pipe in.
To learn more about The Tunneling Company’s Down The Hole (DTH) Boring System visit www.thecrossingcompany.com.
Просмотров: 657

Видео

How the Advanced Hydraulic Hammer Works - The Tunneling Company
Просмотров 21021 день назад
The Tunneling Company’s advanced Hydraulic Hammer allows for efficient, economical installation of large diameter steel pipe (36” to 192”diameter) where other boring or tunneling methods are not feasible: beneath crossings in wet, granular, unstable or shallow ground conditions. Our proprietary, ultra-high-energy hydraulic pipe ramming system sheers the soil to eliminate skin friction resistanc...
HDD Intake Process - The HDD Company
Просмотров 15321 день назад
The HDD Company is changing the way we install subsea intakes for feed water desalination projects using low-impact horizontal directional drilling techniques. Employing microporous HDPE intake pipe, this four-step process has negligible impact on the marine environment and sea life. It offers substantially lower construction costs, virtually eliminates operator safety concerns, and involves a ...
Railway Crossings Made Easy - The Tunneling Company
Просмотров 14 тыс.21 день назад
The Tunneling Company’s trenchless solutions are the perfect way to avoid interruptions when installing infrastructure that intersects with railways. These crossings can be completed with no impact on the tracks, ensuring that our work does not interfere with the operations of railway owners. In addition to being disruption-free, our services can successfully work in shallow cover and unconsoli...
Golden Ears Force Main Trenchless Project of the Year Runner Up - The Trenchless Company
Просмотров 6429 месяцев назад
The Golden Ears Force Main project ensured that wastewater was safely diverted across the Fraser River while the Northwest Langley Wastewater Treatment plant underwent a significant expansion. Learn why this innovative collaboration between The Crossing Group, BlueFox Engineering, and Pomerleau was named the 2023 Trenchless Technology New Installation Project of the Year Runner Up!
The Crossing Group Overview
Просмотров 391Год назад
The Crossing Group is one of the largest trenchless construction companies in North America. We specialize in providing the energy, municipal, civil and utility sectors with the integrated, full-service offering of solutions required to overcome the simplest or most complex crossing challenges. We have the people, the processes, the technology and the capacity to efficiently handle projects of ...
Murray River Pipeline Crossing Project - The HDD Company
Просмотров 216Год назад
The Crossing Company and The Tunneling Company worked together to complete a challenging pipeline crossing near the Murray River. Learn how our two expert companies managed complex technical requirements to make this project a resounding success.
Horizontal Down the Hole (DTH) Drilling Demonstration - The Crossing Group
Просмотров 1,1 тыс.2 года назад
The Tunneling Company is an industry leader in Horizontal DTH (Down the Hole) drilling - allowing our partners to complete trenchless crossings previously thought to be impossible. The Horizontal DTH methodology allows for pipeline installations through hard geological conditions that preclude many other tunneling methods. Learn how this innovative technology can help you successfully complete ...
Meet The HDD Company
Просмотров 1,1 тыс.2 года назад
Serving the USA from our headquarters in Sacramento, California, The HDD Company has a proven track record for completing a wide array of horizontal directional drilling projects both as a sub-contractor and as a prime contractor. We own and operate an integrated fleet of heavy and light HDD rigs and tunneling equipment and are a trusted provider of HDD services for major utility installations ...
Meet The Tunneling Company
Просмотров 1,2 тыс.2 года назад
Headquartered in Kamloops, British Columbia, The Tunneling Company (formerly Kamloops Augering & Boring Ltd.) serves clients across North America. We have over 40 years of tunneling and boring experience in Canada and the US, representing multiple generations of construction knowledge. To learn how The Tunneling Company can meet your tunneling needs, visit www.crossinggroup.com.
Meet The Crossing Company
Просмотров 1,3 тыс.2 года назад
For over 20 years, The Crossing Company has provided advanced horizontal directional drilling (HDD) solutions to industrial, municipal construction and utility clients across western Canada and around the world. Our extensive fleet of heavy and light rigs allow us to take on projects of all size and scope - whether it involves a single rig or requires multiple units and crews to work simultaneo...
Eureka Subsea Cable Project - The HDD Company
Просмотров 1,2 тыс.2 года назад
The HDD Company helped create the infrastructure required to run fibre optic cables essential for telecommunications from Singapore to Eureka, California. These cross-continental cables run across the ocean floor, but had to be connected to the shore. Learn how The HDD Company helped ensure the success of this challenging shore approach using the directional bore method and a custom-made rig.
STARS Rescue in the Rockies - The Crossing Group Gives Back
Просмотров 1214 года назад
Here's an inside look at 2019's Rescue in The Rockies fundraising efforts. Stars Air Ambulance provides critical emergency services for the oil and gas industry, and the community as a whole, and rely on community support to keep going.
The Crossing Group - What We Do
Просмотров 2 тыс.6 лет назад
The Crossing Group - What We Do
The Tunneling Company - What We Do
Просмотров 6 тыс.6 лет назад
The Tunneling Company - What We Do
The San Francisco Bay Project - The HDD Company
Просмотров 3129 лет назад
The San Francisco Bay Project - The HDD Company
The HDD Company - What We Do
Просмотров 1,5 тыс.9 лет назад
The HDD Company - What We Do

Комментарии

  • @DaHitch
    @DaHitch 6 дней назад

    I like how the one system is highly cost effective and the other system has high cost effectiveness. A solution for all possible eventualities.

  • @hedgehog3180
    @hedgehog3180 10 дней назад

    Good to know if I ever end up operating a railway company.

  • @denniselvy3528
    @denniselvy3528 18 дней назад

    It's no good what they will do with all the orange cone 😂😂😂

  • @williamcarlson5405
    @williamcarlson5405 19 дней назад

    From WC, I hope this can be used under roads also as most construction companies I have ever seen that put some sort of utility underground do a terrible job as they dig up the road to put the utility under the road and then cover it up and pave it! It is usually so rough it is worse than a “Speed Bump”, even on a 60-70 mph Road!

  • @oo0Spyder0oo
    @oo0Spyder0oo 20 дней назад

    Would have been interesting to know how the pipes are cleared s they get pushed through the dirt.

  • @Astroponicist
    @Astroponicist 20 дней назад

    Systems like this could be adapted to environmental conditions present on Luna especially the hydrohammer. Both systems show potential for teleoperation in permanently shaded craters at the South Pole region where water ice with mixed grade aggregate under cryogenic temperatures will be an incredibly important challenge to overcome. Luna has sub surface conditions that may vary from concrete like water ice & aggregate to unstable mixed grade aggregate.

  • @elbuggo
    @elbuggo 20 дней назад

    Brilliant!

  • @HtoTheB
    @HtoTheB 21 день назад

    I don't work for a utility, nor a rail infrastructure company. I have no idea, how I ended up at this video, but I love it!

  • @CahNdeso-z4p
    @CahNdeso-z4p 25 дней назад

    Hdd😊

  • @pennybergmen8933
    @pennybergmen8933 2 месяца назад

    I still think this is funny

  • @nickarmstrong4599
    @nickarmstrong4599 3 месяца назад

    This warms my heart. Thank you! <3

  • @nickarmstrong4599
    @nickarmstrong4599 3 месяца назад

    World Class. Noice.

  • @nickarmstrong4599
    @nickarmstrong4599 3 месяца назад

    This technology that The Crossing Group is using is phenomenal. Wow.

  • @walterrutherford8321
    @walterrutherford8321 5 месяцев назад

    What is the longest tunnel (at least 1m wide) that you can bore? How far in a day? How long would it take your R&D to develop a new, but pre-existing, method to at least triple that?

  • @pennybergmen8933
    @pennybergmen8933 9 месяцев назад

    Hahaha haha hahahaha

  • @christinecarsoncarson2672
    @christinecarsoncarson2672 9 месяцев назад

    Good job 👍

  • @user-tx5tw7fc5g
    @user-tx5tw7fc5g 10 месяцев назад

    Good

  • @antontreis6077
    @antontreis6077 11 месяцев назад

    Tcc forward!

  • @dianaworthen9582
    @dianaworthen9582 2 года назад

    Nice overview guys. But something seems off at 0:13...!

    • @dirtdr74
      @dirtdr74 2 года назад

      Exit side rig in freewheel (rig on other side of the crossing is turning clockwise)

  • @crossinggroup
    @crossinggroup 2 года назад

    Pardon the audio issues. We are working out the bugs for live stream.

  • @rdizzleoriginal
    @rdizzleoriginal 2 года назад

    Great presentation

  • @MS-if7sp
    @MS-if7sp 5 лет назад

    Fuck this company!!!!!