Sigandhur Cable Stayed Bridge || Kalasavalli || Tumari || NH369E || Extra-dosed Bridge
Просмотров 7522 месяца назад
Extra-dosed bridge(2 lane) across Sharavathi backwaters & approaches between Ambargodu & Kalasavalli The length of the bridge is 2,125 mtr and approaches on both sides is 4.055 km #SigandurTemple 11 meters width road(2lane) 1.5meters footpath on both sides
Bengaluru Suburban Railway Project Progress || Corridor -2 || Mallige Corridor || Chikkabanawara
Просмотров 6922 месяца назад
Corridor -2 Retaining wall construction is not at a good pace!!!
Bangalore Cantonment Station Redevelopment Project Progress || Indian Railways
Просмотров 2,2 тыс.2 месяца назад
Est cost: 442 Crores
Bengaluru Suburban Railway Project || Benniganahalli || Hebbal || Corridor 2 || Infrastructure
Просмотров 4,8 тыс.3 месяца назад
Bengaluru Suburban Railway Project || Benniganahalli || Hebbal || Corridor 2 || Infrastructure
NH167N || CHINCHOLI to MIRYAN highway project || Kalaburagi || Karnataka || Highways
Просмотров 1,4 тыс.5 месяцев назад
Tenders floated for new highway #NH167N #Chincholi #Miryan
Bommasandra Metro Station Connectivity Issues || We Demand Subway or Foot Over Bridge
Просмотров 5895 месяцев назад
Bommasandra Metro Station Connectivity Issues || We Demand Subway or Foot Over Bridge
Hosur Road Expansion|| Four Laning || Namma Metro || Yellow Line
Просмотров 1,8 тыс.5 месяцев назад
Tenders floated to use dumping yards on Hosur road to increase highway to four lane
Bengaluru Circular Railway Line || 23,000Crores Ambitious Project to Decongest Bengaluru City Tracks
Просмотров 2,4 тыс.5 месяцев назад
Video talks about Bengaluru Circular Railway Project With focus on Doddaballapura to Devanahalli line. #AshwiniVaishnaw #VSomanna #Siddaramaiah #Karnataka #RailwayLine #Bengaluru
Kaveri water lifting to lakes and streams in Kanakapura || Karnataka || Kaveri Nammadu
Просмотров 1626 месяцев назад
Tenders floated for kaveri water lifting project which benefits more than 30-40 villages in kanakapura taluk
Mangaluru - Bengaluru New High Speed Expressway Plan || DPR Preparation || NH75 || Shiradi Ghat
Просмотров 9 тыс.6 месяцев назад
Tenders floated for: New high speed expressway plan between mangaluru to bengaluru This is part of PM gati shakti national plan. So old tunnel plan is shelved. #ShiradiGhat #Mangaluru
ESI Hospital Bommasandra || 200 Bed Hospital Construction || Anekal
Просмотров 6866 месяцев назад
Tenders floated for 200 bed ESI hospital in Anekal. Location: Iggaluru, Chandapura-Anekal Road Cost: 233Crores
Chikkamagaluru - Mysuru Road Expansion Works || NH373 || Four Lane Road
Просмотров 1 тыс.6 месяцев назад
Tenders floated for NH373
Electronic City is closer to North Bengaluru || Huskur Railway Station
Просмотров 3,1 тыс.6 месяцев назад
Huskur Railway Station developed as part of baiyappanahalli hosur doubling project Once this station is open to public, it will reduce travel time to electronic City
Railway Station near Outer Ring Road || Bellandur Road Railway Station work progress
Просмотров 2 тыс.6 месяцев назад
Work happening as part of railway doubling project this will bring 5 tracks for bellandur road station , 2 heightened platform & foot over bridge
Mudigere to Chikkamagaluru Road Widening Project|| NH173 || Karnataka|| Highways
Просмотров 9346 месяцев назад
Mudigere to Chikkamagaluru Road Widening Project|| NH173 || Karnataka|| Highways
Bengaluru Suburban Railway Project|| Corridor-2 || Mallige || Benniganahalli || Chikkabanawara
Просмотров 4,2 тыс.6 месяцев назад
Bengaluru Suburban Railway Project|| Corridor-2 || Mallige || Benniganahalli || Chikkabanawara
Silkboard Double decker flyover all set to open for the public by July-15th(only one way)
Просмотров 4,4 тыс.6 месяцев назад
Silkboard Double decker flyover all set to open for the public by July-15th(only one way)
Bengaluru Suburban Railway Project Progress- Corridor 4 #Heelalige to #Rajanukunte #KRIDE
Просмотров 6 тыс.6 месяцев назад
Bengaluru Suburban Railway Project Progress- Corridor 4 #Heelalige to #Rajanukunte #KRIDE
Bengaluru Suburban Railway Project Progress || Benniganahalli
Просмотров 2,4 тыс.7 месяцев назад
Bengaluru Suburban Railway Project Progress || Benniganahalli
Namma Metro - Airport Route Progress
Просмотров 1,1 тыс.7 месяцев назад
Namma Metro - Airport Route Progress
Bengaluru Suburban Railway Project - Corridor 2 || Demolition & Rehabilitation Works started-Hebbal
Просмотров 1,6 тыс.7 месяцев назад
Bengaluru Suburban Railway Project - Corridor 2 || Demolition & Rehabilitation Works started-Hebbal

Комментарии

  • @viswanathswamy4637
    @viswanathswamy4637 5 часов назад

    Superb explanation

  • @vinodnagaraju5220
    @vinodnagaraju5220 20 часов назад

    bro where did you get all this data from. It actually passes through my land.

  • @Dharmaveerp5463
    @Dharmaveerp5463 2 дня назад

    Good

  • @apexflex226
    @apexflex226 2 дня назад

    Bro can I get this railway planning please

  • @abhilash_hc
    @abhilash_hc 3 дня назад

    Where can we get this map ? is it developed by you or released somewhere..?

  • @chakravarthyv2294
    @chakravarthyv2294 3 дня назад

    Why is this route going inside Tamil nadu..Bagalur, Eluvapalli are in Tamil nadu but Hosur is not covered..What logic is this?..will this project ever take off?

  • @botchamp1978
    @botchamp1978 3 дня назад

    it will be opened during R%G% birth centenary

  • @rahmansyed10
    @rahmansyed10 3 дня назад

    Explain full ring around bangalore

  • @shashikumarp4348
    @shashikumarp4348 3 дня назад

    Suburban rail is best

  • @Gibn45
    @Gibn45 3 дня назад

    Hi bro make Video on Bettahalsoor Rajankunte Bypass Chord Line as been Sanctioned

  • @praveenkumar-ng3fw
    @praveenkumar-ng3fw 3 дня назад

    Nice good information

  • @naveengowda9049
    @naveengowda9049 4 дня назад

    Great video with a clear explanation.

  • @RupayiRaja
    @RupayiRaja 4 дня назад

    thanks bro

  • @chethanreddy86
    @chethanreddy86 5 дней назад

    How much width of land required?

  • @suryas3556
    @suryas3556 23 дня назад

    Huskur road near fruit market need to widen.. Everytime it is blocked and if it festive season one will not be able to walk aswell due to 100s of truck getting blocked to enter market

  • @maheshshetty3940
    @maheshshetty3940 27 дней назад

    ಪ್ಲೀಸ್ ದಯಮಾಡಿ ತಿಳಿಸಿ

  • @maheshshetty3940
    @maheshshetty3940 27 дней назад

    ಯಾವ ಯಾವ ಟರ್ನಿಂಗ್ ನಲ್ಲಿ ಬದಲಾವಣೆ ಆಗುವುದನ್ನ ನೋಡುವುದು ಹೇಗೆ

  • @Muthukumar_Ramu
    @Muthukumar_Ramu Месяц назад

    Superb video.. New station will be built at the marathahalli? For connecting to baiyappanahalli metro station

  • @warishislxlr
    @warishislxlr Месяц назад

    Jai Nitin Gadkari

  • @gmshagil19
    @gmshagil19 Месяц назад

    Good news sir can update current status

  • @manjubn7211
    @manjubn7211 2 месяца назад

    fake video?? from last 12 years road is still in progress. gadkari should drive here?

  • @manjubn7211
    @manjubn7211 2 месяца назад

    nice comedy video?? please drive after sakleshpur ??? and experience international standards for yourself?

  • @northernlites_aura
    @northernlites_aura 2 месяца назад

    They could have made more platforms where line's could have gone ahead to majestic but these over smart planners made all new platforms as terminal platforms

  • @gwsam8062
    @gwsam8062 3 месяца назад

    what about whitefeld kengeri line any update???

  • @stalwarts17
    @stalwarts17 3 месяца назад

    Glad to see this getting shape. Hope to ride on K-Rail this lifetime of mine. Thanks for the video update.

  • @miriyalajeevankumar5449
    @miriyalajeevankumar5449 3 месяца назад

    How far will be the new station to the benniganahalli Metro station by walk?

  • @miriyalajeevankumar5449
    @miriyalajeevankumar5449 3 месяца назад

    Keep doing good work

  • @abhimali9058
    @abhimali9058 3 месяца назад

    Any update on this??

  • @sage.rivendell
    @sage.rivendell 3 месяца назад

    Will there be a doubling of the SWR line? Or all the space for expansion has been handed out to K-Ride?

    • @IndexKarnataka
      @IndexKarnataka 3 месяца назад

      That new track work happening is for suburban line... But catch here is, once one track is laid, existing train operations of SWR will be shifted to new suburban line. Once remaining three track works are finished. Left hand side 2 tracks will be handed over to suburban and right hand side tracks will be handed over to SWR as doubled track

  • @pajayrao6536
    @pajayrao6536 3 месяца назад

    Thank you for this video. It would be helpful if more infra enthusiasts show updates in Bengaluru Suburban Rail Project.

  • @errorgamer112
    @errorgamer112 3 месяца назад

    Information on yellow background blocking the view 😊

    • @DeepakGS-jf5es
      @DeepakGS-jf5es 3 месяца назад

      Yeah that's true we cant able to see properly, its good that he gave some information for us but let it be small and show it for 15 to 20 seconds. Thank You.

  • @santutsk
    @santutsk 3 месяца назад

    No good video. AI voice.

  • @prakashkaintaje5548
    @prakashkaintaje5548 3 месяца назад

    Bogus news

  • @MrVSMANI
    @MrVSMANI 4 месяца назад

    Is Huskur is a new Rly station?

  • @anuragpandey2635
    @anuragpandey2635 4 месяца назад

    Great video. Keep it coming

  • @akhilakarnatakabangarpetps5772
    @akhilakarnatakabangarpetps5772 4 месяца назад

    Good information sir 🎉🎉🎉🎉🎉

  • @MrRanjithmurthy
    @MrRanjithmurthy 5 месяцев назад

    By looking at Route this making another mess, better they atleast make it like Nandi Hills road , instead of going Interior villages

  • @nitishhittal319
    @nitishhittal319 5 месяцев назад

    Link kalstira nangey route map bek agitu

  • @abhimali9058
    @abhimali9058 5 месяцев назад

    And if possible pls share number have some dought regarding this project... Please

  • @abhimali9058
    @abhimali9058 5 месяцев назад

    Bro whats the status of this project..? And is they bridge building betwenn this road or only road in flat??

  • @rohithkulal8027
    @rohithkulal8027 5 месяцев назад

    As Mangalorian we have no trust on these . Iam pretty sure even after 10 years this project will remain on paper only just like shiradi ghat tunnel project. It will be better if they complete the current highway work instead of going to another project

  • @amolatope
    @amolatope 5 месяцев назад

    No where any work seems to be going on. Is it slow progress or project is on hold?

  • @kocheng176
    @kocheng176 5 месяцев назад

    Keep on daydreaming

  • @chandrakanthaurs3596
    @chandrakanthaurs3596 5 месяцев назад

    It is better project because traffic problems solved already existing road is there , if bengaluru Mangaluru express highway planed and completed then More than 50 kilo metres distance save agutte , petrol diesel save aguutte, travel time 3 hours save agutte , shiradi land slide problem solve agutte. , better connectivity sigutte , express highway both side industries develop agutte , many crores of rupees save aguutte I suggest the government if India and national highways authority of india complete the said bengaluru mangaluru high speed expressway as early as possible

  • @vijayinformativevlogs1627
    @vijayinformativevlogs1627 5 месяцев назад

    Devru WT about PRR

  • @rrarjun8
    @rrarjun8 5 месяцев назад

    ನಮ್ಮ ಬೆಂಗಳೂರು ..❤

  • @prasadanand1252
    @prasadanand1252 5 месяцев назад

    So except for the train sets,everything is ready for the yellow line right?

  • @RajKumar-bd7kf
    @RajKumar-bd7kf 5 месяцев назад

    The existing service road on Hosur road is largely encroched by four wheeler vehicles which are permanently being parked there and the administration is taking no steps against such illegal parking.What is the use of widening the service road?This will again be used for illegal parking.

  • @dhirajshettigar7731
    @dhirajshettigar7731 5 месяцев назад

    Bro Hassan to BC road give us the correct status

  • @suhas17101995
    @suhas17101995 5 месяцев назад

    It's already 10 lanes no ? What are they expanding?