Tunneling and Hydropower
Tunneling and Hydropower
  • Видео 29
  • Просмотров 47 195
NRV Valve
Non Returning Valve (NRV valve) are used in tunnels where there is excess seepage water even in the concrete lining tunnels. To let those ingress water into the tunnels, NRV valves are installed in those seepage areas which let the incoming water into the tunnel but do not let the inside water to go out.
Просмотров: 17

Видео

Alimak (Alikraft) in vertical tunnel excavation
Просмотров 420Месяц назад
Alimak or Alikraft is a type of machine to raise bore any pilot shaft from bottm of any vertical or inclined shaft. Purpose of the use of this machine is to excavate underground shaft in any hydropower project or for irrigation purposes or as per required. It is a very challenging type of job to excavate shafts with this type of machines.
Horizontal Tunnel Breakthrough
Просмотров 53Месяц назад
Horizontal Pressure Tunnel- 1 (HPT-1) of length 870 m has been through to the bottom of Vertical Pressure Shaft 1 (VPS-1). Its Lower Solu Hydropower Project 82 MW
bishwokarma puja
Просмотров 402 месяца назад
Bishwakarma Puja is a Hindu festival dedicated to Lord Vishwakarma, who is considered the divine architect and engineer in Hindu mythology. He is credited with the creation of the palaces, weapons, and chariots for the gods. The festival is observed with great reverence, especially by workers, craftsmen, engineers, and those involved in industries related to construction, manufacturing, and mac...
penstock pipe bend welding
Просмотров 1042 месяца назад
penstock pipe bend welding
Rock Bolt pull out test
Просмотров 5362 месяца назад
Rock bolt pull-out test is a crucial procedure in tunnel construction and maintenance, designed to assess the anchoring strength and stability of rock bolts used to support tunnel linings. During the test, a hydraulic jack is used to apply a controlled load to the rock bolt, pulling it out of its anchor point within the rock mass. The force required to dislodge the bolt is measured, providing i...
Hydraulic Test of Headworks Structures
Просмотров 3,1 тыс.3 месяца назад
In a hydropower project, hydraulic testing of the headworks structures is an essential stage to guarantee the facility's safe and effective operation. The headworks structure is essential for managing the water flow into the hydroelectric system. It consists of parts including the intake, gates, and trash racks. To assess how well these structures function under different flow circumstances and...
Mucking in tunnel
Просмотров 1463 месяца назад
mucking is a process of removing materials from the accumulated place. In case of tunnel, after the blast of the tunnel face, the accumulated rock or soil materials are removed and dumped in a selected place. This process is called mucking. Muck is the term for the accumulated materials. Mucking inside the tunnel is done with the help of muck loader and truck or wagons which transport the muck ...
Geological Overbreak in Tunnel
Просмотров 444 месяца назад
Sometimes, overbreak in weak rock mass condition becomes a headache in tunnel construction. It is a great challenge to recover and proceed forward with safe execution
Installation of cable anchor 30m
Просмотров 2845 месяцев назад
Installation of Cable Anchor 30m (Double Corrosion Protected) in length for slope protection. Cable anchoring for slope protection is a crucial technique used to stabilize steep terrain and prevent erosion or landslides. It involves strategically placing high-tensile steel cables into the slope at varying depths and angles. These cables are securely anchored into the ground using methods such a...
Highest railway bridge
Просмотров 8245 месяцев назад
Highest railway bridge
Hydropower Project - Likhu IV 52.4 MW
Просмотров 2835 месяцев назад
Hydropower Project - Likhu IV 52.4 MW
Sunkoshi Marin Diversion Project- After the Breakthrough
Просмотров 2,9 тыс.5 месяцев назад
Sunkoshi Marin Diversion Project- After the Breakthrough
Breakthrough of Vertical Pressure Shaft
Просмотров 616 месяцев назад
Breakthrough of Vertical Pressure Shaft
Mucking Inside Tunnel
Просмотров 1406 месяцев назад
Mucking Inside Tunnel
Shotcreting works on slope
Просмотров 987 месяцев назад
Shotcreting works on slope
wet test of headworks structures
Просмотров 32 тыс.8 месяцев назад
wet test of headworks structures
Surge Shaft
Просмотров 1829 месяцев назад
Surge Shaft
Lower Solu Hydropower Project Headworks Area
Просмотров 2,6 тыс.9 месяцев назад
Lower Solu Hydropower Project Headworks Area
A short trip to desilting chambers
Просмотров 5010 месяцев назад
A short trip to desilting chambers
Open Blast of boulders
Просмотров 3443 года назад
Open Blast of boulders

Комментарии

  • @sbrown314
    @sbrown314 29 дней назад

    Looks like a horrendous job for the workers

  • @SanubabuPanta
    @SanubabuPanta Месяц назад

    Yo blcting gareko ke ko lagi ho kegarnako lagi ho janakari hunelele batai dinus la

  • @thehunter3889
    @thehunter3889 2 месяца назад

    where the fuck are you? Pluto?

  • @amanshukla9223
    @amanshukla9223 3 месяца назад

    🎉🎉

  • @surendrarijal3442
    @surendrarijal3442 4 месяца назад

    मरिनखोला मा बाध बालेर त बागमती मा पानी पठाउने होला।

  • @sancortexstk5252
    @sancortexstk5252 5 месяцев назад

    Would have been better if you had explained the difference between a road tunnel and a water tunnel dug by TBM.

  • @NA-co9tv
    @NA-co9tv 8 месяцев назад