RTWE- Lorry App
The Rother Tidal Walls East team has successfully created and deployed a mobile app that enables close monitoring of material deliveries to the site. With over 200,000 tonnes of material to be delivered under strict planning conditions, controlling material movement is key to maintaining high productivity and ensuring the project's success. This clip is a demonstration of the front end of the app that the gate persons use of 5G note pads
Просмотров: 14

Видео

Rother Tidal Walls East- WaveArts and Luke Brabants
Просмотров 573 месяца назад
Rother Tidal Walls East welcomed Luke Brabants, a local artist, come to site to create a mural at our Camber Fields area to depict the River Rother and it’s habitat. He created the scene over the week and it is now complete for the public to see. The site is on the Camber Fields area and is parallel to a public footpath/cycle path. Luke is a renowned artist who has worked in many successful com...
Rother Tidal Walls East- 2022 Scheme overview
Просмотров 173 месяца назад
2022 Scheme overview- Pre main construction works
Rother Tidal Walls East Case Study- Use of a spider excavator with a remote track machine for piling
Просмотров 2233 месяца назад
The Rother Tidal Walls East project in Rye, Kent, involves raising existing embankments for 6.5km along the River Rother to increase flood protection. Most of the embankment raising is achieved by adding clay to the crest and landward side of the existing profile. However, a 300m section called King’s Avenue has limited space for construction and no space at all for widening the embankment. Ins...
Rother Tidal Walls East 2023 Round Up
Просмотров 6549 месяцев назад